ORDINARY MEETING MINUTES 20 NOVEMBER 2014
17. The stormwater quality treatment system shall be designed and implemented
generally in accordance with “Option 1” presented in the “Site Based
Stormwater Management Plan (4298-1.0) for 66 Rene Street” dated 9 October
2014 by STORMwater Pty Ltd.
18. An ongoing maintenance contract for the stormwater quality treatment devices
must be established and provided to Council prior to commencement of use of
the new building on the eastern portion of the site. The maintenance contract
schedule must be consistent with the manufacturer’s requirements to achieve
an ongoing pollutant reduction efficiency of 80% reduction in Total Suspended
solids, 60% reduction in Total Phosphorous and 45% reduction in Total
Nitrogen in runoff from the site compared to an untreated situation.
19. All copies of stormwater maintenance documentation must be kept for a period
of 5 years and made available to Council officers on request to demonstrate
compliance with the conditions of this approval.
Earthworks
20. Any earthworks required on site shall be carried out in accordance with
Council’s Planning Scheme Policy PSP5 – Engineering Design Standards –
Roads, Drainage and Earthworks and must be undertaken in accordance with a
Development Permit for Operational Works.
21. Earthworks carried out on site shall not affect the structural integrity of any of
the adjoining properties, existing fences or structures that border the
development site. Fences that are affected shall be replaced prior to the
Building Certifier issuing the Certificate of Classification. In this regard any
fences to be replaced shall be clearly shown on the plans submitted for
Operational Works approval.
UNITYWATER
The following Unitywater conditions are applied in accordance with the South East
Queensland (Distribution and Retail) Restructuring Act 2009 and Unitywater’s Interim
Connections Policy. The conditions below form part of a water connection aspect
which are taken to be a water approval for a staged connection. Any future
applications must be made to Unitywater under South East Queensland (Distribution
and Retail) Restructuring Act 2009. Unitywater can be contacted as follows:
Phone: 1300 0 Unity (1300 086 489)
Email: [email protected]
Web: www.unitywater.com
Water & Sewerage
22. Reticulated water supply and sewerage must be provided to the development.
23. Construction activities must not impede the access of Unitywater or Fire
Brigade personnel to vital infrastructure (eg. valves, fire hydrants and sewer
access chambers).
24. The fire-fighting demand on Unitywater’s water supply system from the
development must not exceed 30 litres per second.
25. A single Unitywater installed primary water meter must be provided immediately
inside the property boundary. Meters must be Unitywater approved, installed in
accordance with Unitywater requirements and remain accessible at all times for
reading and maintenance purposes.
26. Water meters must be located on alternative boundaries to electrical pillars.
Noosa Shire Council Page 15 of 19
This is not an official copy of Council’s Minutes