Traffic Engineering Correspondence
Attached to the e-mail Response to Council information request - MCU16/0066 & OPW16/0133 - email 2 of 3.
Figure 3 shows the estimated 2029 PM traffic movements at the Myall Street/Holts Road intersection based
on these changes.
opment 2029 Estimated Peak Hour Volumes Including Proposed Development
a k Hour Weekda y PM Pea k Hour
502 417 633
Myall Street 85 Myall Street
144
186 92 236
42 215
258 177
Holts Road
Figure 3: Estimated 2029 PM Movements at Myall Street/Holts Road – Scenario 3
Scenario 4: Gap Acceptance and Follow Up Headway of 6 seconds and 3.5 seconds respectively
In this scenario, the Sidra default critical gap acceptance will be reduced from 7 and 4 seconds respectively to
6 and 3.5 seconds respectively. These values are still higher than identified in Austroads Guidelines and the
Sidra User Guide for a two lane two way road. Whilst applying these alternative values, the following input
data is still considered to be conservative:
Heavy vehicle percentage;
Traffic growth rates;
Base traffic volumes;
Traffic generation of industrial land use;
Fast food traffic generation; and
Shared trips.
Scenario 5: All Alternative Values in Table 1
In this scenario all alternative values from Table 1 will be used, including:
a critical gap acceptance and follow up headway of 6 seconds and 3.5 seconds respectively; and
2014 base volumes for the ‘upgrade option’;
0.4vph/100m2 GFA for industrial traffic; and
15% shared trips for fast food and service station traffic.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.