AADT – 2014 Percentage Heavy Heavy Vehicle
Traffic Section
(veh/day) Vehicles (%) Growth Rate (%)
Myall Street 9965 11 2.7 (2014 – 2029)
1.9 (2029 – 2054)
Cudgerie Drive 2120 3.3 3.0 (2014 – 2029)
2.0 (2029 – 2054)
3.2.2 Pavement Design Traffic
The Design Equivalent Standard Axle loadings (DESA) adopted for the pavement designs of the local
roads are summarised in Table 11. The detailed traffic calculations are included in Appendix B.
Table 11 Design Equivalent Standard Axles (Local Roads)
Road DESA (ESA’s)
1
Black Mountain Range Road (Ch 0 m – Ch 160 m (MC30)) 1.25 million
Black Mountain Range Road (Ch 160 – Ch 850 m (MC30)) 535,000
Gardners Road 300,000
Existing Bruce Highway widening (Northbound) 2 million
Existing Bruce Highway widening (Southbound) 14.5 million
2
Uhlmanns Road 1 million
3
Woodswallow Lane 50,000
Nandroya Road 1.5 million
Myall Street 9.5 million
Cudgerie Drive 650,000
Future Service Road / Elm Street (existing Bruce Highway) 4 million
4
Holts Road 5 million
3
Christies Road 50,000
5
Southern Interchange Connection Road 25 million
Notes: 1. Includes Contract 2 construction traffic.
2. Based on minimum council requirements for a local road and Contract 1 & 2 construction traffic.
3. Based on minimum council requirements for an access road.
4. Based on minimum council requirements for an industrial road.
5. Based on combined northbound exit ramp, southbound exit ramp and 75 % (assumed) Holts Rd traffic volumes.
The widening works along the northbound lane of the existing Bruce Highway at the intersection with
Gardners Road will be used as a side track during construction and includes an allowance for three
months of Bruce Highway traffic, after which it has been designed to allow for future Gardners Road
traffic only.
The widening works along the southbound lane of the existing Bruce Highway at the intersection with
41/24401/11/437270 Bruce Highway (Cooroy to Curra) Upgrade Section A (Cooroy Southern Interchange - Sankeys Road) 12
Job No. 263/10A/12, Invitation No. NCHD-2454
Pavement Design Report
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.