2008/299
22. The carparking area shall be designed to comply with the provisions of AS/NZS 2890.1-2004
for user class 2 with allowance for vehicles to enter and leave the site in a forward gear and
with a minimum head clearance (headroom) at any point of 2.3m.
23. All carparking shall be clearly line-marked in accordance with the approved plans and be kept,
maintained and in a condition fit for use.
24. The “existing carpark and access driveway” shown accessible from Douglas Street in the
southeast corner of the site on some of the submitted plans is NOT an existing site condition
and does not form part of this approval.
Roof Water & Stormwater Drainage
25. Roof runoff from the existing and new buildings on the site shall be directed to a rainwater
storage system or tank that is installed to ensure water from the rainwater storage system or
tank is used for external uses (such as watering gardens, irrigation, ornamental ponds, water
features, topping-up swimming pools, outdoor cleaning, etc) and for internal (ground floor) use
in washing machine cold taps and toilet cisterns. All rainwater tanks are to be designed and
installed in accordance with the Queensland Development Code (QDC) current at the time of
building approval, and shall be part of the plumbing application for approval. The location and
capacity of the tanks shall be clearly shown on the plans submitted for Building Works
approval and any overflow shall be directed to Council’s stormwater drainage systems in the
adjoining roads.
26. To ensure that polluted run-off does not enter Council’s stormwater drainage system,
stormwater run-off from the carparking area on Lot 5 SP 194338 shall have the first flush (the
first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor/gross pollutant trap to be
incorporated into the existing drainage collection pit in the carparking area prior to being
permitted to discharge into Council’s drainage system.
A detailed maintenance plan shall be prepared for the grease/oil arrestors/gross pollutant trap.
The maintenance plan shall be incorporated in the developed site management scheme and a
copy of this shall be provided for Council’s records prior to commencement of the approved
Use.
All other clean stormwater, such as roof water, can be collected on site and discharged
through a single underground drain line directly into the existing drainage system, bypassing
the grease/oil arrestor/gross pollutant trap.
27. All site stormwater drainage shall be by means of a gravity system.
Fire Hydrants
28. Fire hydrants are to be provided on the development site in accordance with Council
Engineering Design Standards and in accordance with Queensland Fire Service Standards.
The provision of fire hydrants and any required booster pump shall be in accordance with the
Building Code of Australia, and consultation may also be needed with Queensland Fire
Services to ensure suitable fire fighting infrastructure is provided. To this end any necessary
fire hydrants shall be clearly shown on the plans submitted for Building Works approval and if
a booster pump is deemed necessary, the plans shall indicate where the fire truck is to be
accommodated in order to provide boosting to the water supply.
Erosion and Sediment Control
29. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
Page 4 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001AB5B5.001.pdfRelated documentPublic source context ↗
SUPERSEDED Decision Notice - 010.2008.00000299.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 70 KB (small file)
- File type
No other editions are linked here.