Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

001AB5B5.001

of 11

Text shows just the words. Original shows the document exactly as it was published.

Text sections not matched to the original PDF pages. See original document to check page numbers.

                                                                                         2008/299



Contributions Towards Council Infrastructure
30.     Monetary contributions shall be paid to Sunshine Coast Regional Council towards the cost of
        providing and/or upgrading various infrastructure at the rates applicable at the time of
        payment. An estimate only of the contribution amounts under the current Council policies and
        requirements is outlined in the table below:

         Contribution Required For:                                                    Amount:
         PSP12 – Public Open Space Contributions (Park)                                $17,873
         PSP16 – Sewerage Headworks Contributions                                      $18,353
         PSP17 – Water Supply Headworks Contributions                                  $31,609
         PSP20 – Pathway Trunk Network Contributions                                   $5,443
         TOTAL Contribution Amount =                                                   $73,278
         Please note, that these amounts are all subject to variations in the Consumer Price Index, All
         Groups Brisbane from March 2009 until the date of payment.

        All contributions must be paid prior to Council’s endorsement of the plan of survey.
        In the event that the Development Permit for Material Change of Use of Premises lapses or is
        cancelled, any paid contributions and/or the trading bank guarantee will be returned.
General
31.     Any damage caused to any public utility during the course of construction shall be repaired to
        Council’s standards and at no cost to Council.
32.     Any alteration of any public utility or other facilities necessitated by the development of the
        land or associated construction works external to the site shall be at no cost to Council.
33.     The transportation of all materials to and from the site shall be undertaken in a manner such
        that no particle matter escapes onto a public road. All vehicles carrying materials either to or
        from the site shall be covered to prevent materials including dust being windblown from the
        vehicle.
Refuse
34.     Paved waste storage areas shall be provided on site for all wheelie bins.
35.     The existing wheelie bin cleaning contract shall be continued, or alternatively, an on-site bin
        washing facility connected to the sewer shall be provided.
Health
36.     The development shall comply with all the health-related requirements of Local Law No. 22 for
        Rental Accommodation.
Noise
37.     Noise emission from mechanical equipment shall comply with the following requirements:
        37.1      Air-conditioning and Refrigeration
                     7am to 10pm: Maximum background + 5dB(A)
                     10pm to 7am: Maximum background + 3dB(A)
        37.2      Pumps
                     7am to 7pm: Maximum background + 5dB(A)
                     7pm to 10pm: Maximum background + 3dB(A)

                                                                                      Page 5 of 11

Used in these records

About this file

File size
70 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001AB5B5.001.pdf · 70 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.