Log in to see the plans as drawnTable 6: Staged Landforms Available Airspace
Stage Estimated Air-Space Capacity Estimated Landfill Life
m3* As at 30 June 2014 #
1 96,600 1.9 years
2 586,000 12 years
3 461,000 9.4 years
4 1,609,600 32 years
Total 2,753,200 55 years
* Based on June 2014 survey.
# Landfill life based on an annual airspace consumption rate of 49,000m 3
Methane Gas Extraction
In 2011 the Council entered a 20 year contract with LMS Generation Pty Ltd (LMS) for the
provision of a methane gas flare on the Eumundi Rd landfill. A portion of the landfill is supplied with
underground gas collection pipes to collect methane gas generated during the natural
decomposition of organic waste.
The substantial infrastructure (underground collection pipes
and gas flare) was provided at no cost to Council. In return,
LMS has the rights to the gas generated on the landfill during
the 20 year contract period. The captured methane gas is
flared (burnt) to convert methane gas into carbon dioxide, with
the resultant burnt gasses discharged to the environment.
Carbon dioxide is also a greenhouse gas impacting on the
environment. However it is preferable as it has only 1/20th the
environmental impact of methane.
LMS receives carbon credits/revenue for the destruction of
methane, which pays for the equipment installed. At the
present time there is insufficient gas generated in the collection
system to pay for the costs to generate electricity. If electricity
generation becomes viable in the future the electricity
generated and fed into the Noosa electricity grid would provide
a revenue return to LMS/Council that would pay for the
generator. This is a more desirable outcome instead of merely
flaring the gas to the open atmosphere.
Fig 13: Flaring of Methane Gas
However, when organic waste is removed from the landfill this limits the methane generated in the
future and may limit the future viability of electricity generation.
Waste Reduction & Recycling Plan - Page 16