Council archive · source document
Reference Document - Storm Water Management Plan 132001.210327.1
Plans and drawings: the text below has words only, no drawings.
Important:
There is no specific criteria relating to the placement of an on-site dispersion system (rubble
pit), however, it is suggested that it be placed a minimum of three (3) metres from any
boundary, building or structure. Where the land slopes toward the boundary this distance should
be increased accordingly.
The objective is to ensure there is no risk to the structural integrity of buildings and structures
and to achieve “sheet flow” at the property boundary. “Sheet flow” is the flow across a property
boundary that would have occurred naturally had there not been any building work at the
property.
Document Set ID: 23245585 Page 2 of 2 October 09
Version: 1, Version Date: 16/09/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Reference Document - Storm Water Management Plan 132001.210327.1Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.