Skip to the record
Accept no substitutions.

Council archive · source document

Reference Document - Storm Water Management Plan 132001.210327.1

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                                                 ABN 51 640 311 842
                                                                                                                            CONTACT
                                                                                                                    arcosgroup.com.au
                                                                                                                             OFFICES
                                                                                               Sunshine Coast | Brisbane | Gold Coast




                 1         Introduction
                 Arcos Unit Group Pty Ltd (Arcos) has been commissioned by Peter Flavel to prepare this Stormwater
                 Management Plan as part of a development application with Noosa Shire Council (NSC). The subject
                 site is described as Lot 2 on GTP100987 and has an area of 1,105m2. A site locality plan is presented
                 in Figure 1. The existing dwelling is located at 2 The Beach Houses - 2/27 Ross Crescent, Sunshine
                 Beach, Queensland.




                 FIGURE 1: SITE LOCALITY (SOURCE: NSC)
                 The subject site includes a large existing dwelling with a highset a garage. The site falls east towards
                 Sunshine Beach.
                 The property is located within the “Coastal area – erosion prone area” as noted in the SARA DA
                 mapping.



                 2         Proposed Development
                 It is proposed to renovate the existing dwelling. This renovation consists of the removal of the existing
                 garage, guest pavilion, entry decking and dilapidated roof section, and the construction of a new home
                 office, new garage, family room and new roof section. These proposed renovations are shown below in
                 Figure 2 and Figure 3.




                 28 August 2024


Document Set ID: 23245585
Version: 1, Version Date: 16/09/2024

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Reference Document - Storm Water Management Plan 132001.210327.1.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.