Council archive · source document
Reference Document - Storm Water Management Plan 132001.210327.1
Plans and drawings: the text below has words only, no drawings.
ABN 51 640 311 842
CONTACT
arcosgroup.com.au
OFFICES
Sunshine Coast | Brisbane | Gold Coast
FIGURE 2: SITE PLAN (SOURCE: SEALAND ARCHITECTS)
FIGURE 3: EXISTING SITE PLAN (SOURCE: SEALAND ARCHITECTS)
3 Existing Drainage
There is no existing public stormwater network near the subject lot. Instead, the existing dwellings roof
runoff is captured and discharged to a rubble pit. This rubble pit is located downhill of the dwelling near
the lot’s eastern boundary, see Figure 4. The rubble pit sheet flows to the east towards Sunshine Beach
Park before reaching the beach itself.
28 August 2024
Document Set ID: 23245585
Version: 1, Version Date: 16/09/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Reference Document - Storm Water Management Plan 132001.210327.1Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.