Council archive · source document
Approved Concept Environment Management Plan OPW11/0116.01
Plans and drawings: the text below has words only, no drawings.
A staged approach of construction is being adopted and this construction plan is relevant only for Stage 1 of the works [Figure 4]. Stage 1 includes: Retain existing rock wall [maintain / upgrade as required] Submerged channel closure [partial] Wall at end of Noosa River Spit Groyne / Training Wall Dredging for navigation (location to be determined) Foreshore nourishment Removal of dead trees (marine plants) as required Widening of access track The submerged channel closure and groyne are to be constructed using sand-filled geotextile mega-containers. The wall has been modified from the original design and is to be constructed of a combination of sand-filled geotextile mega- containers and rock. : Proposed Stage 1 Works [preliminary design] 4. RELEVANT APPROVALS The following approvals have been attained: Resource Entitlement ref: 2010/009024 Development Approval ref: OPW11/0116 Prescribed tidal works ref: SPCC01881911 Interfering with Marine Plants:2011DB0083 ERA 16 1(b) ref: SPCE01881811 Registration Certificate ENRE02969911 Clearing (Nature Conservation Act) ref: WICL09310811 oo0ooo0°0
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Concept Environment Management Plan OPW11/0116.01Related documentApplication case desk ↗
About this file
- File size
- 4.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.