ltr_Response to Council IR_Final 190430

Attached to the e-mail MCU18/0204 - Response to Information Request - 6 Heron St Peregian Beach - Part 1 of 2.

of 23

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

application, the design incorporates operable facades, shaded by recycled timber batten screening
and native landscaping to the building edge to promote a ‘breathable’ building allowing tenants to
choose to naturally ventilate the building in cooler times of the year.
The proposed materials, including recycled timber, glass and significant amounts of soft landscaping
within the facades of the building complement the beachside character of the locality and the Peregian
Beach “village feel”. It is also a vast improvement when considered in the context of the existing
vacant, convenience store which makes minimal contribution to the local beachside character.



      Item 7: Please provide elevations with and without vines.

Response:
Amended elevations showing the proposal without the planting are now included within the
architectural plans. This is provided Attachment A.




      Item 8: Provide a preliminary Construction Management Plan for the development.
              The plan must include but not be limited to the following:

              a. traffic management during all aspects of the development including:

                      i.    a Traffic Management Control Plan (for demolition, deliveries
                            and construction) in accordance with the Manual of Uniform
                            Traffic Control Devices (MUTCD) detailing all temporary
                            signage and traffic control measures

                      ii.   maintenance of safe pedestrian access for the areas affected
                            by the works during and after daily construction has ceased

                      iii. proposed fencing to the site during the demolition and
                           construction phases of the development

                      iv. provision for worker car parking at off-site locations

              b. maintenance and protection of water quality and existing drainage lines
                 through the construction site, through the implementation of
                 appropriate erosion and sediment control measures

              c.   works programme identifying key components of the works and their
                   respective durations

              d. establishment of a communication protocol with the general public,
                 adjoining owners, emergency services and local businesses



 LTR_RESPONSE TO COUNCIL IR_FINAL 190430                                                             8
Log in to download the original file

ltr_Response to Council IR_Final 190430.pdf · 2.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.