Original source · versioned page text
ltr_Response to Council IR_Final 190430
Attached to the e-mail MCU18/0204 - Response to Information Request - 6 Heron St Peregian Beach - Part 1 of 2.
e. identification of complaint management procedures including:
i. contact details for the on-site manager
ii. dispute resolution procedures
f. details on the location of external dumps sites, the haulage route, type
of vehicle to be utilised during operations and frequency of usage. NB
any damage to the existing road system as a result of haulage
operations will be fully repaired at the applicant’s expense
Response:
PBWorkforce have prepared a comprehensive preliminary Construction Management Plan dealing
with each item requested in item 8. This is included at Attachment 3 of the Information Request
Response.
Item 9: Provide a preliminary design and maintenance regime of the hanging
plants which demonstrates the planter boxes are easily accessible for
maintenance whilst not compromising any acoustic or safety elements. The
response should incorporate any changes as a result of the information
request.
Response:
The Applicant has considered Council’s feedback and has amended the proposed roof terrace plan
(Ref: 21-03). The proposed roof terrace plan has been annotated to include a sliding panel in the glass
to allow maintenance access to the planter boxes. This has been displayed in Figure 5 below.
The inclusion of sliding panels ensures that the planting is accessible to building management for on-
going management. Further details regarding the planting and requirements for maintenance can
reasonably be conditioned as part of the development approval.
LTR_RESPONSE TO COUNCIL IR_FINAL 190430 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.