Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

SARA_Information response

of 27

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Public passenger transport infrastructure and active transport

Performance Outcomes                        Acceptable Outcomes                            Comment

PO26 Upgraded or new public                 No acceptable outcome is prescribed.           Complies with PO
passenger transport infrastructure and
                                                                                           No changes to the public transport
active transport infrastructure is
                                                                                           infrastructure or active transport
provided to accommodate the demand
                                                                                           network has been made
for public passenger transport and
active transport generated by the
development.

PO27 Development is designed to             No acceptable outcome is prescribed.           Complies with PO
ensure the location of public passenger
                                                                                           A Porte cochere will be provisioned
transport infrastructure prioritises and
                                                                                           which will enable access for a 21 seater
enables efficient public passenger
                                                                                           bus which will connect to Noosa
services.
                                                                                           Junction Station to provide connections
                                                                                           to the wider public transport network.

                                                                                           The Porte cochere also allows for set
                                                                                           down areas for taxis and other car share
                                                                                           services

PO28 Development enables the                No acceptable outcome is prescribed.           Complies with PO
provision or extension of public
                                                                                           A Porte cochere will be provisioned
passenger services, public passenger
                                                                                           which will enable access for a 21 seater
transport infrastructure and active
                                                                                           bus which will connect to Noosa
transport infrastructure to the
                                                                                           Junction Station to provide connections
development and avoids creating
                                                                                           to the wider public transport network.
indirect or inefficient routes for public
passenger services.                                                                        The Porte cochere also allows for set
                                                                                           down areas for taxis and other car share
                                                                                           services

PO29 New or modified road networks          AO29.1 Roads catering for buses are            Complies with AO
are designed to enable development to       arterial or sub-arterial roads, collector or
                                                                                           TTM has provided a functional layout for
be serviced by public passenger             their equivalent.
                                                                                           Banksia Street/ Grant Street roundabout
services.
                                            AND                                            to be upgraded in accordance with
                                                                                           Austroads to cater for buses and service
                                             AO29.2 Roads intended to
                                                                                           vehicles accessing the site.
                                            accommodate buses are designed and
                                            constructed in accordance with:

                                            1. Road Planning and Design Manual,
                                            2nd Edition, Volume 3 – Guide to Road
                                            Design; Department of Transport and
                                            Main Roads;

                                            2. Supplement to Austroads Guide to
                                            Road Design (Parts 3, 4-4C and 6),
Log in to download the original file

SARA_Information response.pdf · 7.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.