Decision Letter - Change to an Existing Approval - extension to relevant period [As Published] · 132006.271.02

of 14

Text shows just the words. Original shows the document exactly as it was published.

                                                                                         2006/271

30.   All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel,
      footpath paving and landscaping such as trees and grasses in accordance with Council’s
      Standard specifications prior to commencement of the use permitted by this permit.
Pathway Contributions
31.   A pathway contribution of $356 towards external major pathways, in accordance with Planning
      Scheme Policy PSP41 Pathway Trunk Network Contributions, shall be paid to the Council
      prior to obtaining a Development Permit for Operational Works. This amount will be subject to
      variations in the Consumer Price Index, All Groups Brisbane from June 2006 until the date of
      payment.
Stormwater Drainage
32.   All stormwater drainage shall be collected on site and discharged so there is no net increase
      in stormwater runoff from the site. Stormwater drainage permitted to drain from the site shall
      be discharged to Council’s kerb & channel street drainage system generally in accordance
      with Drawings No 16076-OW2 dated May 2006 by SCG Consulting Engineers. Plans of the
      drainage design shall be prepared by a Registered Professional Civil Engineer and submitted
      to Council prior to obtaining a Development Permit for Operational Works.
      The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street
      drainage system at any one location is 25 litres/second.
33.   Roof runoff from any new dwelling shall be directed to an individual rainwater storage system
      or tank (minimum storage 3000 litres per dwelling/unit) that is installed to ensure water from
      the tank can be used for external uses (such as watering gardens, irrigation, ornamental
      ponds, water features, topping-up swimming pools, outdoor cleaning, etc) and for use in
      flushing of toilets internal to the dwelling. All rainwater tanks are to be designed and installed
      in accordance with the Queensland Development Code (QDC), Part 25 – Rainwater Tanks,
      and shall be part of the plumbing application in conjunction with the building approval. The
      location and capacity of the tanks shall be clearly shown on the plans submitted for Building
      Works approval and any overflow shall be directed to the road frontage.
34.   The development shall not adversely impact on the existing drainage conditions of the
      adjoining properties by blocking or diverting the natural overland runoffs. This may require the
      design and construction of drainage pipes and/or an overland flow-path within the
      development site that caters for stormwater runoff from the adjoining sites for a design storm
      with an Average Recurrence Interval of 1 in 100 years. In this regard a Development Permit
      for Operational Works shall be obtained.
35.   All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
36.   The site shall be connected to Council’s existing sewerage reticulation systems and be
      constructed in accordance with Council’s standards and requirements at no cost to Council.
37.   In order to achieve adequate cover over the sewer main traversing the proposed driveway, the
      sewer main within the site shall be relocated (lowered) generally in accordance with the
      submitted Drawing No 16076-C1 dated July 2006 by SCG Consulting Engineers. The
      proposed sewer main relocation works shall be at no cost to Council. A Development Permit
      for Operational Works shall be required.
38.   The existing sewer main that traverses the site and those located in the adjoining properties
      and the ‘zone of influence’ (taken as the area within a 45-degree angle measured from the
      invert of the sewer main to the finished surface level) shall be accurately located and
      determined by a licensed Surveyor and shown on all plans submitted for Operational Works
      approval.



                                                                                      Page 5 of 14

Used in these records

About this file

File size
82 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Letter - Change to an Existing Approval - extension to relevant period [As Published].pdf · 82 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.