Decision Letter - Change to an Existing Approval - extension to relevant period [As Published] · 132006.271.02
2006/271
To ensure Council’s sewer main is accessible for maintenance purposes and is protected from
risk of damage no structures requiring a building permit (eg. buildings, swimming pools,
retaining walls exceeding 1m in height, raised terraces, etc) shall be constructed within this
‘zone of influence’ or within 1.5m of the centreline of the sewer main, whichever is the greater.
In this regard the basement may need to be redesigned. As such the applicant shall amend
Operational Works plans including Building plans to ensure compliance.
39. All Building Applications will need a site plan prepared & certified by a licensed surveyor
clearly illustrating the exact location of all sewer mains within the site or adjacent to the site
and the ‘zone of influence’ of these mains.
Town Water Supply
40. Each dwelling unit shall be connected individually to Council’s existing town water supply and
be constructed in accordance with Council’s standards and requirements at no cost to Council.
41. Each individual water connection to the water reticulation system shall extend to the property
boundary and be metered. All fees for the supply of water meters shall be paid to the Council.
42. All water meters must be located outside the property boundary and in an easily assessable
location to facilitate unhindered reading by Council and/or Council’s contracted water meter
readers, and not behind fences or locked gates. In this regard approval of the water meter
configuration and location must be obtained from Council’s Water & Sewerage Capital Works
Manager prior to lodgement and approval of hydraulic drawings.
Service Easements (Sewer)
43. A registered easement shall be created over the zone of influence of all sewers within the
subject site and over those parts of the subject site that are impacted upon by sewers on any
adjoining sites. The easements shall generally be parallel to and centred over the sewer main
and be equivalent in width to twice the depth to invert level of the sewer at the deepest point
within the allotment (measured from the finished surface) and be no less than 3.0m wide
overall. In this regard a licensed surveyor shall accurately locate all sewer mains and
determine the necessary width of the easement, which shall be shown on any plans submitted
for Operational Works / Building Works approval. To this extent the surveyor shall certify that
the sewer and the zone of influence is wholly contained within the easement to be created.
In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
undertaking in writing that the Title Deed and the easement documents will be lodged at the
Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of
Council will be attended to promptly.
A duly executed copy of the easement shall be submitted to Council for perusal prior to the
use commencing.
Any changes required by Council’s Solicitor must be corrected immediately.
44. No building or other structure shall be constructed or encroach over an easement.
45. Any building or structure within proximity of an easement or any other public utility’s
underground must have its foundations designed so that no surcharge loads are imposed
upon such underground infrastructure. Foundations must be taken down a minimum of 1.0m
below a line of influence measured 1.0m in the direction of the foundation from the centreline
of the closest underground service and along the natural angle of repose of the foundation soil
type(s).
Also, foundations for retaining walls and masonry fences across a sewer main shall be
properly designed and constructed, in consultation with Council’s Sewer Section, to minimize
impact on the sewer main and facilitate future maintenance and upgrading works.
Page 6 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Letter - Change to an Existing Approval - extension to relevant period [As Published]Related documentApplication case desk ↗
About this file
- File size
- 82 KB (small file)
- File type
No other editions are linked here.