Decision Letter - Change to an Existing Approval - extension to relevant period [As Published] · 132006.271.02
2006/271
General
52. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works that will become Council infrastructure (eg sewer
mains), which shall be submitted in conjunction with an application for a Development Permit
for Operational Works. In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed
cadastre layout is to be submitted in conjunction with any application for Operational Works.
53. To facilitate production of As Constructed drawings it is suggested that all design drawings are
submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the
use of ADAC are available at www.adac.com.au).
54. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
55. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
56. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
57. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and
type of all services and structures. All of which shall be submitted to Council for checking and
for Council’s records.
The data must fully detail levels for all engineering works including but not limited to drainage
structures, finished ground levels and pavement surface levels. The data shall be submitted in
the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC
are available at www.adac.com.au).
Approval of works shall not be granted until all As Constructed information has been supplied
and accepted by Council.
Environmental Health
58. A Waste Management Plan (Demolition/Construction) in accordance with Planning Scheme
Policy “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, shall
be submitted for the demolition and construction phases of the development and approved by
Council’s Environmental Health Section prior to the issue of the development permit for
operational works. The Plan shall contain the following information:
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimated On-site Off-site *specify
materials volume *specify *specify contractor and
(m³) proposed re- contractor and landfill site
use or on-site recycling outlet
recycling
methods
Excavation
material
Green waste
Bricks
Concrete
Timber-please
specify
Page 8 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Letter - Change to an Existing Approval - extension to relevant period [As Published]Related documentApplication case desk ↗
About this file
- File size
- 82 KB (small file)
- File type
No other editions are linked here.