Decision Letter - Change to an Existing Approval - extension to relevant period [As Published] · 132006.271.02

of 14

Text shows just the words. Original shows the document exactly as it was published.

                                                                                        2006/271

General
52.   A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
      specifications for all engineering works that will become Council infrastructure (eg sewer
      mains), which shall be submitted in conjunction with an application for a Development Permit
      for Operational Works. In this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed
      cadastre layout is to be submitted in conjunction with any application for Operational Works.
53.   To facilitate production of As Constructed drawings it is suggested that all design drawings are
      submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the
      use of ADAC are available at www.adac.com.au).
54.   Any damage caused to any public utility during the course of construction shall be repaired to
      Council’s standards and at no cost to Council.
55.   Any alteration of any public utility or other facilities necessitated by the development of the
      land or associated construction works external to the site shall be at no cost to Council.
56.   The transportation of all materials to and from the site shall be undertaken in a manner such
      that no particle matter escapes onto a public road. All vehicles carrying materials either to or
      from the site shall be covered to prevent materials including dust being windblown from the
      vehicle.
57.   As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer
      for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and
      type of all services and structures. All of which shall be submitted to Council for checking and
      for Council’s records.
      The data must fully detail levels for all engineering works including but not limited to drainage
      structures, finished ground levels and pavement surface levels. The data shall be submitted in
      the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC
      are available at www.adac.com.au).
      Approval of works shall not be granted until all As Constructed information has been supplied
      and accepted by Council.
Environmental Health
58.   A Waste Management Plan (Demolition/Construction) in accordance with Planning Scheme
      Policy “Waste Management Multi-Dwellings and Commercial and Industrial Premises”, shall
      be submitted for the demolition and construction phases of the development and approved by
      Council’s Environmental Health Section prior to the issue of the development permit for
      operational works. The Plan shall contain the following information:
       MATERIALS ON-SITE        DESTINATION
                                Re-use and Recycling       Disposal
       Expected waste Estimated On-site         Off-site         *specify
       materials      volume    *specify        *specify         contractor and
                      (m³)      proposed    re- contractor and landfill site
                                use or on-site recycling outlet
                                recycling
                                methods
       Excavation
       material
       Green waste
       Bricks
       Concrete
       Timber-please
       specify
                                                                                     Page 8 of 14

Used in these records

About this file

File size
82 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Letter - Change to an Existing Approval - extension to relevant period [As Published].pdf · 82 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.