Decision Letter - Change to an Existing Approval - extension to relevant period [As Published] · 132006.271.02
2006/271
Headworks Contributions
46. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28
and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks
Contributions respectively and at the rates applicable at the time of payment. An estimate
only of the contribution rates under the current policies is outlined below. These amounts will
adjusted in line with changes to the Consumer Price Index, All Groups Brisbane from June
2006 until the date of payment.
Water Supply $2,130
Sewerage $1,366
TOTAL $3,496
All headworks contributions must be paid prior to the issue of a Development Permit for
Operational Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
headworks contributions not be paid at the due time, Council shall call upon the trading bank
guarantee in full.
In the event that the Development Permit for Material Change of Use of Premises lapses or is
cancelled, the contribution or trading bank guarantee will be returned.
Earthworks and Site Stability
47. A Geotechnical Engineer or similar qualified expert shall assess the soil condition on site,
determine the soil classification, establish whether any measures are required to protect the
stability of adjoining buildings and/or structures and/or land, and make recommendations on
the type of foundation system(s) best suited for the proposed development and the
appropriate methods (eg sheet piling) of retaining the excavated batters during the
construction stage. The recommendations of this report shall be incorporated into the design
and construction of the proposed development.
48. Earthworks, piling and anchors for piling works carried out on site shall not affect the structural
integrity of any of the existing fences, structures, lands and sewer mains and services that
border the development site. Fences that are affected shall be replaced prior to the Building
Certifier issuing the Certificate of Classification. In this regard any fences to be replaced shall
be clearly shown on the plans submitted for Operational Works approval.
At any circumstance where anchors or temporary anchors of piling works encroach into an
adjoining property, the applicant will be responsible to obtain a written permission from the
owners of the property prior to applying for Development Permit for Operational Works.
49. Any excavation, piling and anchoring works undertaken shall be supervised and certified by a
Geotechnical Engineer or similar qualified expert.
50. Prior to the commencement of the operational works on the site, an existing conditions survey
of the existing buildings adjoining the site shall be undertaken by a suitably qualified person.
The survey shall include all buildings that may be affected by the proposed works. A report of
the survey shall be submitted to Council’s Construction Technical Officer 5 days prior to the
start of the works.
Erosion and Sediment Control
51. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
Page 7 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Letter - Change to an Existing Approval - extension to relevant period [As Published]Related documentApplication case desk ↗
About this file
- File size
- 82 KB (small file)
- File type
No other editions are linked here.