Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Appendix C - Traffic Assessment Report

of 16

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

The existing site access has been assessed in accordance with Austroads sight distance requirements for
the truck-day base case (ie truck operating in daylight hours) and the norm-day base case (ie normal car
driver travelling at 85th percentile speeds in daylight hours). Of the two cases, the truck-day base case is
generally the critical case.

Louis Bazzo Drive has a posted speed limit of 90km/h in the vicinity of the site. Austroads requires that a
design speed equal to the posted speed limit plus 10km/h (ie 100km/h) be used when calculating sight
distance requirements. Requirements for sight distance for the truck-day base case are outlined in
Austroads Guide to Road Design Part 4A Table A6 and A12 and summarised below using an observation
time 0.5 seconds less than specified in Table A8.

        safe intersection sight distance of 219m for the truck-day base case based on a speed environment
        of 100km/h (195m for the norm-day base base)
        approach sight distance (ASD) of 191m for the truck-day base case based on a speed environment
        of 100km/h (141m for the norm-day base case)
        minimum gap sight distance (MGSD) of 139m, based on a critical acceptance gap of five seconds
        for a vehicle undertaking a right turn manoeuvre in a 100km/h speed environment

The proposed domestic access driveway achieves 230m sight distance to the east and in excess of 300m
to the west. Therefore, the access driveway complies with Austroads EDD sight distance requirements at
domestic accesses.

ROAD SAFETY ASSESSMENT

Requirement

TMR’s Guide to Traffic Impact Assessment (2018) (GTIA) requires a risk assessment of the likelihood and
consequence of safety risks being increased on the state-controlled road network, due to the addition of
site accesses and development generated traffic, pedestrians or cyclists. A risk assessment has been
undertaken using the methodology prescribed in Section 9.3.2 of TMR’s GTIA, to assess the potential
impacts of the proposal on the safety of the state-controlled road network.

Methodology

The risks inherent on the existing state-controlled road network and associated with the addition of
development generated traffic were scored using the risk scoring matrix outlined in TMR’s GTIA, as
reproduced in Figure 4. In undertaking the risk assessment:

        the likelihood of a crash was determined based on the number of similar crashes reported in the
        historical crash data
        the consequence of a crash was based on the Fatal and Serious Injury (FSI) Indexes reported in Part
        4 of TMR’s Manual of Uniform Traffic Control Devices (MUTCD) for different crash types / DCA
        Codes




P:\2021-22\22-192 1179 LOUIS BAZZO DRIVE, COOTHARABA\OUTPUTS\22-192 LETTER REPORT_FINAL.DOCX              5
Log in to download the original file

Appendix C - Traffic Assessment Report.pdf · 2.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.