Town Planning Consent Permit - TPC 2711 Page 3

Where the option of a deferred payment is used in accordance with b. above, the
following conditions shall also apply:-

A. Prior to the issue of a Building Approval, a trading bank guarantee is to be
submitted to the value of the headworks which are due, plus 20%.

B. The subsequent payment of headworks shall include interest charged at the
rate set by the Queensland Treasury Corporation for Local Government
borrowings as they apply to Noosa Shire and current at the time the trading
bank guarantee is submitted.

C. Should the contributions not be paid at the due time, Council shall call upon
the sum secured by the trading bank guarantee.

6m,

D. The trading bank guarantee will be returned on payment of the required
contributions plus interest or on expiry of the relevant Building Approval,
whichever is the sooner.

10. Construction of roadworks, drainage and footpath improvements across the
Viewland Drive frontage of the development to the satisfaction of the Shire
Engineer. Such works shall involve the construction of kerb and channel, bitumen
widening, associated drainage, hot mix correction to the existing pavement, where
required and footpath upgrading works. In this regard, plans prepared by a
registered Civil Engineer are to be submitted to and approved by the Shire
Engineer, prior to the issue of Building Approval.

11. The footpath across the frontage of the site is to be upgraded by the provision of
a 1.2 metres wide concrete footpath and the forming, grassing and topsoiling of the
remaining area to the standards and requirements of the Shire Engineer. The
applicant is to contact Council’s Engineering Department to determine the footpath
alignment prior to the commencement of any works.

12. The developer shall bear the cost of alteration of any public utility or other
facilities necessitated by the development of the land or associated construction
works external to the site.

13. Connection to Council’s existing water supply and sewerage reticulation systems
at the developer’s expense to the standards and requirements of the Shire Engineer.

14. The developer shall provide a metered water connections from the water supply

system to the proposed development, in accordance with Council’s standards and
to the satisfaction of the Shire Engineer.

Print Date: 21 January 2021, 3:51 PM
Log in to download the original file

TPC2711.pdf · 1.4 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.