Skip to the record
The gold standard in government transparency.

Council archive · source document

SPA Decision Notice - 010.2010.00000515.001 [As Published] · 152010.515

of 8

Text shows just the words. Original shows the document exactly as it was published.

                                                                                           2010/515



33.   Any stormwater retention systems and gross pollutant traps must maintain a minimum
      clearance of 1.5 metres from Council water supply and sewerage infrastructure.
34.   Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from Council water
      mains and 1.5 metres from Council sewerage mains. Landscaping plants within these
      clearances must be low growing when mature and suitable Council approved varieties.
35.   Water meters must be located on alternative boundaries to electrical pillars.
36.   Construction works undertaken in the vicinity of Council water supply or sewerage
      infrastructure must not adversely affect the integrity of the infrastructure. All costs associated
      with repair, replacement or alteration of infrastructure must be met by the applicant.
5     REFERRAL AGENCY CONDITIONS

Not applicable.

6     APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:

 Plan / Document No.         Issue.    Plan / Document Name                                Date
 094787                      Rev 4     Proposal Plan – CadCon Surveying & Town             20 May 2010
                                       Planning

7     ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.    The applicant is advised that a Compliance Permit for all plumbing and drainage works within
      the boundaries of the development site shall be obtained from Council’s Plumbing Services
      Section prior to obtaining a Development Permit for Building Works.
2.    Connection to the Council live water supply and live sewerage system must be undertaken by
      Council at the applicants cost.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage.” It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.




                                                                                         Page 5 of 8

Used in these records

About this file

File size
61 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SPA Decision Notice - 010.2010.00000515.001 [As Published].pdf · 61 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.