Original source · versioned page text
2014-01-20 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 20 JANUARY 2014
Page 30 of 86
ORDINARY MEETING AGENDA 20 JANUARY 2014
ORDINARY MEETING AGENDA 14 NOVEMBER 2013
Internal Referrals
Unitywater
The application was forwarded to Unitywater and their assessment forms part of this report.
Internal Referrals
The application was forwarded to the following internal council specialists and their
assessment forms part of this report:
e Development Engineer, Engineering and Environment Assessment Branch
e Hydraulics and Water Quality Specialist, Engineering and Environment Assessment
Branch
e Landscape Officer, Engineering and Environment Assessment Branch;
e Urban Designer, Planning Assessment Branch
e Environmental Officer, Engineering and Environment Assessment Branch;
e Strategic Planner, Strategic Planning Branch and
e Social Planner, Community Planning Branch.
Public Notification
The application was publicly notified for 15 days in accordance with the requirements of the
Sustainable Planning Act 2009. 881 properly made submissions and 85 not properly made
submissions were received. Only 6 submissions were in support of the application, while the
majority of objecting submissions were local residents to the Peregian Beach area.
The following table provides a summary and assessment of the issues raised by submitters.
Inconsistent use in the zone Even though The Noosa Plan was gazetted
- The Noosa Plan is relevant. more than 7 years ago, the document is still
- Peregian Beach Caravan Park approved | relevant, and is reflected in the draft Sunshine
generally in accordance with The Noosa | Coast Planning Scheme retaining many of the
Plan. same zoning and planning provisions for the
- The proposal conflicts with the subject site.
surrounding land uses. - -
- - . . It is agreed that the proposed Regional
- ropes also noon estent wit ne Economic Development Strategy 2013-2033
ral sunsning Coast Panning Scheme. | ide4ntifies that sport and leisure are a key
- Does not align with the Sunshine Coast driver of the economy
Economic Development Strategy, with :
Sport and Leisure identified as being a
key driver of the economy.
Fragmentation of centres The Village square is currently the focal point
- Limited integration. for community interaction in Peregian Beach.
- Competing centres. The proposed development provides no
- Connection is nether short or readily opportunities for integration between the
accessible. subject site and the existing centre, being over
- The Peregian Beach's ‘sense of place’ a 350m walk. The proposed convenience
and human scale of the village is shopping will change the role of the existing
threatened by this application. centre and is likely to adversely impact on the
Village’s ‘sense of place’ being the focal point
for Peregian Beach.
Sunshine Coast Regional Council OM Agenda Page 70 of 360
Page 30 of 86See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.