ORDINARY MEETING AGENDA 20 JANUARY 2014
Page 32 of 86
ORDINARY MEETING AGENDA 20 JANUARY 2014
ORDINARY MEETING AGENDA 14 NOVEMBER 2013
issues Comments
- The duplication of retail uses would
severely impact the economic viability of
the current traders within Peregian
Village and provide no net economic
benefit.
- The reported job creation of the
proposed development is misleading, as
their will be job losses from the existing
centre.
Application Details There are no grounds for council to insist that
- The Application was Lodged and notified | the applicant renotify the application or relodge
in the name of Multi Span Australia Pty the application, particularly given that
Ltd. It did not include its ACN which itis | development approvals under the Sustainable
mandatorily required to do under the Planning Act 2009 are issued over the land
Sustainable Planning Act 2009 and the and not to a person or company.
Corporations Act 2001. As such itis not | Notwithstanding this, the applicant provided
a properly made application and its non- | the ACN number for the applicant on the 19
compliance has not been waived by the | August 2013.
assessment manager. In regard to the community survey
- Voted auestons survey were accompanying the application, the majority of
. the responses in the survey was negative
towards the proposal, and is not considered to
support the applicant’s proposed grounds for
approval.
Traffic Beard Traffic Engineering reviewed the
- Proposal does not include any detail applicant's traffic impact report and
about external road upgrades. subsequent roundabout design. Serious
- The applicant has failed to justify the concerns are raised about the safety of the
inevitable increase in danger to existing | surrounding road network to cope with the
motorists, pedestrians and cyclists using | additional traffic associated with the
Rufous Street, Woodland Drive and the development. It is also recognised there are
David Low Way intersection. substantial constraints regarding upgrading
- Traffic lights for upgrading the Woodland _ | the existing network to cater for the increased
Drive and David Low Way intersection traffic volumes. The Noosa Plan Outcomes are
are not acceptable. not supportive of traffic lights to overcome
- Already existing carparking and traffic these issues. The development will also
issues within Rufous Street, with no significantly impact the amenity and increase
upgrades proposed. traffic noise on the existing residential collector
- Woodland Drive was closed so as to streets.
avoid extra traffic from Peregian Springs. | The proposed design of the shopping centre is
- Onsite manoeuvring will not work, with —_| orientated to Council’s carpark, along David
service vehicles proposed to use the Low Way, even though no formal access is
same access road as patrons entering provided. This carpark was constructed by
the carpark and into the incoming traffic Council, using money collected by
to the site. contributions in lieu for carparking
- There is no means of regularly requirements in the Peregian Beach Village
monitoring shop delivery activities and Square, and intended for use by staff of the
would, no doubt, rely solely on nearby village tenancies and parking for the adjacent
residents to report infringements of community facility.
agreed limits. . . .
- Customers will park in the Council The development will create conflicts with the
carpark on David Low Way, which will users of the existing community uses adjacent.
Sunshine Coast Regional Council OM Agenda Page 72 of 360
Page 32 of 86See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.