14. At least 278 off-street car parking spaces (including 31 spaces on the adjoining
hotel site - Lot 2 on RP842280) shall be provided with at least 6 of the spaces
suitable for use by persons with disabilities within close proximity to the main
access to the retail areas and signed appropriately. Some of these spaces must
be converted to provide for 8 motorcycle/scooter spaces. Access thereto shall be
via a bitumen sealed or concrete pavement.
The car parking spaces and associated manoeuvring areas shall be in
accordance with Australian Standard AS2890.1-1993 with respect to dimension
and gradient for User Class 3 and User Class 4 for the disabled spaces.
15. The proposed carpark layout shall generally be in accordance with the approved
plans.
26. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Plan No. Rev. Plan Name Date
DA.01 4 Site Plan (as annotated), drawn by 23.08.2017
Thomson Adsett
DA.02 2 Demolition Plan, drawn by Thomson Adsett 15.08.2017
DA.03 3 Proposed floor plan (as annotated), drawn 23.08.2017
by Thomson Adsett
17BRT0143 D Sheet Recommended traffic modifications – site 29.11.2017
1 of 3 plan, (as annotated) drawn by TTM
Consulting Pty Ltd
17BRT0143.02 D Sheet Recommended traffic modifications – 29.11.2017
2 of 3 northern area, drawn by TTM Consulting Pty
Ltd
17BRT0143.02 D Sheet Recommended traffic modifications – 29.11.2017
3 of 3 southern area (as annotated), drawn by
TTM Consulting Pty Ltd
17BRT0143.03 A Sheet Recommended traffic modifications – 29.11.2017
1 of 1 Southern area – B99 vehicle sweep paths,
drawn by TTM Consulting Pty Ltd
27. The total use area of the development is 4,568m2.
29. The colour scheme for the development is to be generally in accordance with the
approved plans.
B. Refuse to amend condition 23.
C. Include new Conditions 37, 38, 39, 40 and 41 as follows:
37. Fixed bicycle parking capable of holding 20 bicycles is required to be located at
the main public access points to the centre.
38. The site is required to upgrade existing landscaping which must be landscaped
in accordance with an Operational Works approval.
39. All works associated with the upgrading of the car park must be done in
conjunction with an Operational Works approval. Note: Operational works for
Page 3 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.