               NOOSA COUNCIL IDAS Development Application Decision Notice                                                            4


                          A $ 5000 site control bond is required, to ensure compliance with this condition.
               16         Development undertaken in accordance with this approval must generally comply with the approved
                          plans of development. The approved plans are numbered DA01-04 inclusive prepared by Leffler Simes
                          Pty Ltd Architects and dated 18 August, 1998 and as may be amended by these conditions.
               17         The development must be undertaken and operated in a manner that causes no detrimental effect upon
                          the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other
                          emissions.
               18         The open space and setback areas are to be landscaped in accordance with Council’s Policy on
                          Landscaping Guidelines and a properly prepared landscape plan submitted. Such landscaping is to be
                          completed prior to the premises being occupied and maintained at all times thereafter to the reasonable
                          satisfaction of the Manager of Planning.
               19         The Landscaping plans are to provide for large feature trees, minimum of 100 litre, in the car park and
                          frontage areas of the development.
               20         Any advertising sign or device is to comply with the provisions of Council's policies on advertising.
               21         All goods are to be displayed on site within the property boundaries. There is to be no display of goods
                          on the streets about the site.
               22         The developer must submit security in the form of a cash bond or trading bank guarantee to the sum of
                          $1000, prior to the issue of a Development Permit for building works:-
                          22.1     $5000 for site control bond required as per condition 15;
                          22.2     $5000 to secure performance of all conditions of this development approval.
                          The cash bond or trading bank guarantee will be returned upon payment of the required sums and
                          performance of the conditions of approval.
               23         The requirements of this development approval are to be effected, prior to the use of the premises.
                          Council reserves the right to call upon the bond or guaranteed sum referred to in this approval to effect
                          compliance with conditions.
               24         This Development Permit for a material change of use of premises lapses if:-
                          24.1     the use or erection of a building or other structure associated with the use, has not been
                                   commenced within four (4) years of the date of issue of the Development Permit, unless
                                   application is made and approved by Council for an extension; or
                          24.2     the use of any premises pursuant to the Development Permit ceases.
               25         Prior to the commencement of development, the developer must obtain the following Development
                          Permits:-
                          25.1     Development Permit for building works;
                          25.2     Development Permit for plumbing and drainage works;
                          25.3     Development Permit for operational works of landscaping, carparking and access;



               Additional Conditions – specifically relating to Change Approval 16 February 2005 (Lot 1 SP 127822)

               Land Development
               Park Contributions
               26     A Park contribution of $1,596 towards the acquisition of additional parkland or the improvement of existing
                      parkland and facilities in the locality shall be paid to the Council prior to obtaining a Development Permit
                      for Building Works in accordance with Council’s Planning Scheme Policy PSP24 Park Requirements. This
                      amount will be subject to variations in the Consumer Price Index, All Groups Brisbane from September
                      2004 until the date of payment.
               Pathway Contributions
               27     A pathway contribution of $145 towards external major pathways, in accordance with Planning Scheme Policy
                      PSP41 Coastal Major Pathway Contributions, shall be paid to the Council prior to obtaining a Development
                      Permit for Building Works. This amount will be subject to variations in the Price Index, All Groups Brisbane from
                      September 2004 until the date of payment.




               SEP c:\users\noo.ecm.prod.web.svc\appdata\local\temp\8dbd82cb-99de-4615-b2c2-5e26abc8f49b.tmp

                                                                                                                 Print Date: 28 February 2024, 10:52 AM
Log in to download the original file

Attachment 2 - Current Decision Notice.pdf · 586 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.