Original source · versioned page text
Attachment 2 - Current Decision Notice
Noosa Council documents
NOOSA COUNCIL IDAS Development Application Decision Notice 5
Headworks
28. Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28 and PSP30 on Water
Supply Headworks Contributions and Sewerage Headworks Contributions respectively and at the rates
applicable at the time of payment. An estimate only of the contribution rates under the current policies is outlined
below. These amounts will adjusted in line with changes to the Consumer Price Index, All Groups Brisbane from
September 2004 until the date of payment.
Water Supply $1,000
Sewerage $620
TOTAL $1,620
All headworks contributions must be paid prior to the issue of a Development Permit for Building Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the headworks
contributions not be paid at the due time, Council shall call upon the trading bank guarantee in full.
In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled, the
contribution or trading bank guarantee will be returned.
General
29 Any damage caused to any public utility during the course of construction shall be repaired to Council’s
standards and at no cost to Council.
30 Any alteration of any public utility or other facilities necessitated by the development of the land or associated
construction works external to the site shall be at no cost to Council.
31 The transportation of all materials to and from the site shall be undertaken in a manner such that no particle
matter escapes onto a public road. All vehicles carrying materials either to or from the site shall be covered to
prevent materials including dust being windblown from the vehicle.
32 Security in the form of a cash bond or trading bank guarantee to the sum of $3000 must be submitted, prior to
the issue of a Development Permit for building works to ensure no damage occurs to the environment and/or to
any of Council’s infrastructure.
The cash bond or trading bank guarantee will be returned upon payment of the required sums and performance
of the conditions of approval.
33 Prior to the commencement of development, the following Development Permits must be obtained: -
33.1 Development Permit for building works.
Advice
1 Approval of this development application will trigger an Infrastructure Charge in accordance with the Coastal
Major Road Network Infrastructure Charges Plan for the estimated amount of $17,283. This amount will subject
to variations in the Consumer Price Index, All Groups Brisbane from September 2004 until the date of payment.
An Infrastructure Charge Notice will be issued in accordance with Chapter 5 of the Integrated Planning Act 1997.
Payment via credit card transaction will not be an acceptable method of payment for development contributions
conditioned in this permit or for infrastructure charge notices issued separately.
2 We advise ‘interested parties’ i.e. ‘developer’, ‘owner’, ‘tenant’ to consider their responsibilities under the
Disability Discrimination Act (DDA) in regard to the installation of disabled access and the provision of disabled
facilities, and that access to this building and the provision of sanitary facilities may need to comply with the
requirements of Section D Part D3 and Section F Clause F2.4 of the Building Code of Australia.
3 Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if the cost of
operational works exceeds $80,000, then a portable long service levy is required to be paid. In accordance with
Section 77.(1) of the Act, Council is required to sight the approved form issued by the Building and Construction
Industry (Portable Long Service Leave) Authority that confirms that the requirements of the Act have been
satisfied. A statutory declaration outlining the cost of the operational works must be submitted to Council with the
lodgement of any application for operational works over the site.
SEP c:\users\noo.ecm.prod.web.svc\appdata\local\temp\8dbd82cb-99de-4615-b2c2-5e26abc8f49b.tmp
Print Date: 28 February 2024, 10:52 AM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.