Decision Notice - Approved by Delegation of Authority - RAL26 0001 (As Published)
Currency Period
2. This development approval lapses if the requirements of the conditions have not been
completed and an application for plan seal is not lodged with Council by 13 August 2030
unless an application to extend the currency period is approved by Council.
Approved Plans
3. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table below.
Plan No. Rev. Plan/Document Name Date
25-6646AA - Plan of Proposed Reconfiguration of Lot 58 on 21/10/2025
RP32777, prepared by Max Watterson & Associates
4. All lot numbering on the subdivision plan to be submitted to Council for compliance
assessment must remain as shown on the Approved Plans.
5. The easement documentation for the access easement over proposed Lot 1 must include
terms that permit the owner and occupier of Lot 1 to access and use the easement area for
the purpose of undertaking ongoing inspection, repair and maintenance of any building, roof
drainage infrastructure or associated services located on, or forming part of, Lot 1.
6. Certification must be submitted to Council from all relevant service providers (Energex, NBN)
which certifies that the development has met the requirements of this Decision Notice and
all applicable legislation at the time of construction.
7. Prior to Council signing the Plan of Survey, landscaping must be established along the full
eastern side of the access easement shown on the Approved Plans. The landscaping must
comprise Syzygium australe planted at 1.0 metre centres, with each plant being a minimum
1.0 metre in height and supplied in a minimum 200mm pot size at the time of planting. The
landscaping must be maintained in a healthy condition and any dead, damaged or diseased
plants must be replaced.
ENGINEERING
Property Access and Driveways
8. A residential driveway must be constructed to service Lots 1 and 2. The works must be
undertaken in accordance with an Operational Works approval and be generally in
accordance with Auxilium Consulting’s Operational Control Layout Plan (C902, Rev. B) dated
20 July 2026.
Stormwater Drainage
9. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with the Queensland Urban
Drainage Manual and be generally in accordance with Auxilium Consulting’s Stormwater
Management Report (Rev. 3) dated 21 July 2026.
10. Prior to Council signing the Plan of Survey, certification from a suitably qualified person
(RPEQ) must be provided to Council certifying that proposed Lots 1 and 2 have been
provided with a Lawful Point of Discharge pursuant to sections 3.6 and 3.9 of the Queensland
Urban Drainage Manual in a manner that does not substantially damaging a third-party
property.
Services
11. Reticulated electricity and telecommunication services must be provided to each lot in
accordance with the standards and requirements of the relevant service provider.
12. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
Page 2 of 6
Document Set ID: 25061670
Version: 4, Version Date: 18/08/2026