Project Management Plan

Attached to the e-mail Operational Works Application OPW21/0212 - 31 Bottlebrush Ave, - DA Form 1 - Civil & Landscaping Plans - Construction Management Plan - Qleave - Project Management Plan - Traffic Management Plan - cover letter.

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
3.7 Personal protective equipment
       PPE for subcontractors'workers must be supplied and maintained by the subcontractor.
       Subcontractors will also be responsible for providing any necessary training for their workers in the use of each item of PPE,
       if required.
PPE must be worn or used in accordance with the following table:
PPE                                PPE to be worn/used:
Hard hat                             Must be worn at all times        To be worn as required
Safety boots                         Must be worn at all times        To be worn as required
Hi-visibility clothing*              Must be worn at all times        To be worn as required
Gloves                               Must be worn at all times        To be worn as required
Safety glasses/goggles               Must be worn at all times        To be worn as required
Face shield                          Must be worn at all times        To be worn as required
Respirator                           Must be worn at all times        To be worn as required
Welding mask                         Must be worn at all times        To be worn as required
Harness                              Must be worn at all times        To be worn as required
Protective clothing                  Must be worn at all times        To be worn as required
Life jacket                          Must be worn at all times        To be worn as required
                                     Must be worn at all times        To be worn as required


Subcontractors must provide approved high-visibility clothing for workers
   At all times
   During bulk earthworks
   In proximity to mobile plant
   When working on or adjacent to the road
   Other (provide details below)
Other (details)



The Principal Contractor will also maintain a supply of the following PPE items which will be issued to subcontractors’ workers if
required and back-charged to the subcontractor
   Ear plugs and/or ear muffs
   Hard hats
   Hi-visibility vests
   Dust masks
   Safety glasses
   Gloves
   Other (provide details below)
Other (details)



3.8 Work environment
3.8.1 Managing Dusts

 NOTE: These precautions are not adequate for removing and cleaning up asbestos, or engineered stone benchtop dust and
 residue.

During bulk earthworks, the Principal Contractor (or earthmoving contractor where specified in the contract) will ensure
environmental dust is kept to a minimum by:
   Using water trucks
   Water suppression attachments fitted to the machinery
   Manual hosing
WHSMP-C 01/2018.8                                                Initials                                              Page 14 of 39

                                                ____                           ____
Log in to download the original file

Project Management Plan.pdf · 350 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.