Project Management Plan
Attached to the e-mail Operational Works Application OPW21/0212 - 31 Bottlebrush Ave, - DA Form 1 - Civil & Landscaping Plans - Construction Management Plan - Qleave - Project Management Plan - Traffic Management Plan - cover letter.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnAdditional traffic management measures
Engage qualified traffic controllers to direct vehicular and pedestrian traffic on roads and footpaths adjacent to the work site
Provide gantries over the footpath for pedestrian access
Prepare a traffic management plan outlining the layout of traffic barriers, signs and other traffic control devices
Arrange supply, installation and removal of all traffic control devices
Arrange road and footpath closure permits from relevant authorities as required
Other (provide details below)
Other (details)
3.5.2 Subcontractor's responsibilities (where applicable)
Subcontractors should ensure that:
Workers required to work in the above situations are provided with approved high visibility vests or clothing.
Employees who may be required to work on the road/s or footpath/s adjoining the site have been trained and instructed in
the approved traffic management plan.
3.6 Signage
Signage at the work site will be provided by either the Principal Contractor or the subcontractor, in accordance with the table below:
Item Supplied by
Builder’s sign (QBCC compliant) Principal Contractor Subcontractor
CAUTION Nailing tool in use Principal Contractor Subcontractor
DANGER Asbestos removal in progress Principal Contractor Subcontractor
DANGER Construction site – No unauthorised entry Principal Contractor Subcontractor
DANGER Deep excavation Principal Contractor Subcontractor
DANGER Demolition work in progress Principal Contractor Subcontractor
DANGER Hole/penetration below Principal Contractor Subcontractor
Dust mask/respirator must be worn where required Principal Contractor Subcontractor
Emergency assembly area Principal Contractor Subcontractor
Eye protection must be worn where required Principal Contractor Subcontractor
Fire extinguisher Principal Contractor Subcontractor
Fire hose reel Principal Contractor Subcontractor
First aid room Principal Contractor Subcontractor
Hand protection must be worn where required Principal Contractor Subcontractor
Hearing protection must be worn where required Principal Contractor Subcontractor
High visibility clothing must be worn where required Principal Contractor Subcontractor
Safety footwear must be worn on site Principal Contractor Subcontractor
Safety helmets must be worn on site Principal Contractor Subcontractor
Site office (and directions to) Principal Contractor Subcontractor
Any traffic management signs, where applicable (refer to traffic management plan for Principal Contractor Subcontractor
further details)
Subcontractors will be expected to supply their own signs and barricades applicable to their work on site. Examples include signs
for formwork stripping, electrical work, scaffolding, use of nail guns, dangerous goods and/or hazardous chemicals, etc.
WHSMP-C 01/2018.8 Initials Page 13 of 39
____ ____