Project Management Plan
Attached to the e-mail Operational Works Application OPW21/0212 - 31 Bottlebrush Ave, - DA Form 1 - Civil & Landscaping Plans - Construction Management Plan - Qleave - Project Management Plan - Traffic Management Plan - cover letter.
Supporting documents required for this plan
Appointment of Principal Contractor form
Bullying and harassment policy
Clearance inspection certificate (bonded or B Class asbestos removal)
Crane lifting and fall-arrest equipment inspection register
Electrical equipment (test and tag) register
First aid register
First aid and emergency contacts
Hazard report
Hazardous chemicals register
Hot work permit
Incident investigation report
Induction register
Licensing and training register
Mobile plant register
Placard and manifest quantities - hazardous chemicals
PPE register
Rehabilitation and return to work policy
Risk management and safe work method statements
Safe work method statement checklist (SWMS supporting document)
Safe work method statement register (SWMS supporting document)
Safe work method statement template (Create under SWMS menu)
Service isolation permit
Site health and safety committee constitution
Site health and safety committee meeting minutes
Site HSR and HS committee list
Site safety inspection checklist
Site safety instruction
Subcontractor declaration
Toolbox meeting record
Visitor's log sheet
Work health and safety policy
Work near underground services permit
WHSMP-C 01/2018.8 Initials Page 2 of 39
____ ____
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Project Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.