Project Management Plan
Attached to the e-mail Operational Works Application OPW21/0212 - 31 Bottlebrush Ave, - DA Form 1 - Civil & Landscaping Plans - Construction Management Plan - Qleave - Project Management Plan - Traffic Management Plan - cover letter.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSubcontractors will also be required to
Supply task lighting should the need arise
Provide portable RCDs if power supply has no other RCD protection
Provide a sufficient number of non-conductive leads stands or hangers for use by their workers
Other requirements (provided details below)
Other requirements (details)
Inspection & testing frequency for electrical equipment
All portable electrical equipment must be visually checked by the user, prior to each use. Any damaged equipment must be either
discarded or tagged and put out of service until repaired.
Item Frequency
Extension leads 3 months
Power tools 3 months
Portable socket outlet assemblies 3 months
Portable lights 3 months
Other electrical equipment with flexible lead connection 3 months
Portable RCD Before every use (push button)
3 months (electrician test)
Permanent RCD Monthly (push button)
12 months (electrician test)
Powered site sheds 6 months
Temporary switchboards 6 months
Temporary wiring (construction wiring) 6 months
3.15 Essential services
Where necessary and if practicable, the Principal Contractor will arrange to have services which are likely to be hazardous if
disturbed, isolated before work starts.
3.15.1 Underground services
Underground services Have been identified at the work site by the Principal Contractor as listed below
Have NOT been identified at the work site
The following underground services have been identified by the Principal Contractor at the work site
Electrical
Gas
Water supply
Stormwater
Sewerage
Fuel lines and tanks
Telecommunications cables
Other (provide details below)
Other methods (details)
Where excavation work is being undertaken, relevant information regarding the services will be provided to the
subcontractor or made available in the site map section of this plan. Information provided will include the type, location and
depth of the services as well as any necessary supplementary detail.
The subcontractor must not commence excavation work without obtaining underground services information from the
Principal Contractor beforehand.
Service locations will be identified using the following methods and/or sources
WHSMP-C 01/2018.8 Initials Page 24 of 39
____ ____