Log in to see the plans as drawn3.17 Manual tasks
In order to minimise the risk of musculoskeletal injuries subcontractors will be required to ensure:
Provision and proper maintenance of:
Lifting equipment (e.g. pallet jacks, vehicle loading cranes, trolleys, duct lifters, etc.);
Where required, on-site storage racks for sheet materials (e.g. glass, plasterboard, etc.); and
Fit-for-purpose gloves when handling materials that are likely to cause injury.
Supplier’s instructions for lifting and manual handling of material and equipment are followed;
Manual handling of materials is minimised between levels (particularly deliveries) by utilising cranes, tile and brick
elevators, etc., where provided;
Materials and equipment are stored and stacked to facilitate easy access and handling;
Workers use team-lifting methods when mechanical lifting equipment is not practical to use, and are trained in correct lifting
techniques; and
Work procedures and SWMSs are reviewed if instructed to do so by the Principal Contractor.
3.18 Hazardous chemicals
The Principal Contractor will:
Retain a hazardous chemicals register for all chemicals used at the work site; and
Maintain a central file of Safety Data Sheets (SDSs) (previously known as Material Safety Data Sheets or MSDSs) for all
hazardous chemicals used at the work site.
Subcontractors using or storing hazardous chemicals at the work site will be required to ensure:
Copies of safety data sheets (SDSs) are provided to the Principal Contractor before they are used or stored on site;
SDSs are current (i.e. written or revised within the past five years);
SDSs are readily available to any worker intending to use the hazardous chemical (for example, kept in the work vehicle);
Workers are trained in the use of each hazardous chemical and the safety precautions included in the relevant SDS;
Any PPE, emergency/first aid supplies and specialised equipment, as specified in the SDS or chemical
manufacturer’s/supplier’s instructions, are provided and readily accessible at the work site;
Hazardous chemicals are correctly labelled and any other containers used to decant or hold the chemicals are also correctly
labelled;
Appropriate spill kits, bunds and fire extinguishers are made available, if required, where the chemicals are being used and
stored;
Hazardous chemicals are stored properly in the subcontractors designated area of the work site to minimise the risk of fire,
explosion and contamination;
Large quantities of hazardous chemicals are not stored at the work site;
Permission is obtained from the Principal Contractor beforehand if larger quantities of hazardous chemicals need to be
stored on site and the quantities are likely to exceed the placard quantities specified in Schedule 11 of the Work Health and
Safety Regulation 2011;
Manifest quantities of hazardous chemicals as per Schedule 11 will not be permitted on site; and
Signs, placards and labels applicable to the chemicals being stored or used at the work site, are installed as required.
3.19 Asbestos
Asbestos at this work site Has been identified by the Principal Contractor. The rules and conditions listed below
will apply
Has NOT been identified
Details and location/s of asbestos
Asbestos rules and conditions:
Any subcontractor removing asbestos at the work site must:
Provide the Principal Contractor with copies of appropriate and current business certificates, licensing and
worker/supervisor training records prior to starting work;
Complete and submit a Form 65 – Notification of licensed asbestos removal work to WHSQ (see link on Resources page) at
least five days prior to the commencement of the work, and provide a copy of the same to the Principal Contractor;
Ensure all safety precautions and procedures as per the requirements of the Code of Practice on How to Safely Remove
Asbestos 2011 are strictly adhered to;
WHSMP-C 01/2018.8 Initials Page 26 of 39
____ ____