Project Management Plan

Attached to the e-mail Operational Works Application OPW21/0212 - 31 Bottlebrush Ave, - DA Form 1 - Civil & Landscaping Plans - Construction Management Plan - Qleave - Project Management Plan - Traffic Management Plan - cover letter.

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
       Maintain all signs, barricades and containment barriers to ensure those not involved in the asbestos removal work are
       prevented from entering the asbestos removal area;
       Contain all asbestos dust, airborne fibres and residue to prevent workers outside of the asbestos removal area from being
       exposed.
       Provide the Principal Contractor with a clearance inspection certificate (see Supporting documents) once the work has been
       completed and the area has been decontaminated;
       Ensure all Department of Environment and Resource Management (DERM) and local council requirements for the transport
       and disposal of asbestos waste are complied with; and
       Notify the Principal Contractor immediately if:
                Any asbestos materials are inadvertently disturbed; and/ or
                Any workers or other persons are inadvertently exposed to airborne asbestos fibres.



3.20 Confined spaces
Confined spaces have been identified at the work site                                                   Yes       No


3.21 Hot work
3.21.1 General requirements for hot work
Subcontractors undertaking hot work must comply with the following requirements:
The Subcontractor is required to use a hot work permit (copy provided to the Principal
                                                                                                      Yes       No
Contractor) to undetake any hot work on the work site
       The subcontractor must provide fire extinguishers for any hot work undertaken on site;
       Hot work must not be undertaken:
              Above other workers;
              From ladders;
              In the vicinity of flammable, combustible or explosive materials;
              Without appropriate protective clothing and PPE;
              In enclosed areas without mechanical ventilation;
              In any area where:
                       Workers or others may be exposed to hot spatter, burns or welding flash;
                       Thermal/smoke detection and alarm systems are active.

       Fire extinguishers must be readily available in the area where hot work is being carried out;
       Welding screens must be used for any arc welding unless the welding is being undertaken outside of normal work hours or
       in an enclosed area;
       All flammables and combustible materials must be removed from the work area;
       All flammable or combustible walls, ceilings and fixed materials must be covered or adequately protected; and
       Hot work undertaken in a confined space must be undertaken in conjunction with all confined spaces requirements,
       including the use of a confined spaces permit system.


3.21.2 Additional requirements for the use of oxy-acetylene equipment
The following safety precautions must be adhered to when working with oxy-acetylene equipment:
       Gas bottles must be chained in the upright position within a bottle trolley while in use;
       Flash-back arrestors and compliant regulators must be fitted to all oxy-acetylene equipment; and
       Spare gas bottles must not be stored on site, unless the Principal Contractor has given prior consent.




WHSMP-C 01/2018.8                                             Initials                                               Page 27 of 39

                                                ____                         ____
Log in to download the original file

Project Management Plan.pdf · 350 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.