Project Management Plan

Attached to the e-mail Operational Works Application OPW21/0212 - 31 Bottlebrush Ave, - DA Form 1 - Civil & Landscaping Plans - Construction Management Plan - Qleave - Project Management Plan - Traffic Management Plan - cover letter.

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
5.2 Incident management
5.2.1 First aid
        The Principal Contractor will provide:
               A qualified first aider for every 25 workers (or more if required) and appropriate first aid facilities; and
               An advanced or occupational first aider for every 100 workers
        The Principal Contractor will also be responsible for the upkeep of the first aid kits and ensuring the contents are suitable for
        treating the types of injuries that are likely to occur to workers at the project; and
        Where individual subcontractors have more than 25 workers on the project, they will also be required to provide at least one
        qualified first aider for every 25 workers or part thereof.
A list of qualified first aiders on the project is included in the list below.
Name                                Company                             First aid qualification         Contact number
Steve Cole                          Cole Projects                       Senior first aid                0412552971
Cam Cole                            Cole Projects                       Senior first aid                0407593956


First aid supplies are available in the first aid room. Location details are
In Site office


5.2.2 Notifiable incidents
Notification for all notifiable incidents will be handled by the project manager or the next most senior available representative of the
Principal Contractor, if the project manager is unavailable. Notification to WHSQ must be immediate but the method of notification
will be at the discretion of the Principal Contractor (i.e. phone, fax, email, online, etc.).
        The following types of incidents must be notified to WHSQ:
                A death;
                A serious injury or illness; or
                A dangerous incident.
Serious injuiries or illnesses
        Serious injuries or illnesses include those requiring admission to hospital, or:
               An amputation;
               A serious head injury;
               A serious eye injury;
               A serious burn;
               Separation of skin from underlying tissue (e.g. de-gloving or scalping);
               A spinal injury;
               Loss of a bodily function;
               Serious lacerations; and/or
               Medical treatment within 48 hours of exposure to a substance.
Dangerous incidents
        These include:
               An uncontrolled escape, spillage or leakage of a substance;
               An uncontrolled implosion, explosion or fire;
               An uncontrolled escape of gas or steam;
               An uncontrolled escape of a pressurised substance;
               Electric shock;
               Fall or release from a height of any plant, substance or thing;
               Collapse, overturning, failure or malfunction of, or damage to, any plant that is required to be authorised for use
               under a regulation;
               Collapse or partial collapse of a structure;
               Collapse or failure of an excavation or of any shoring supporting an excavation;
               In-rush of water, mud or gas in workings, in an underground excavation or tunnel; and/or
               Interruption of the main system of ventilation in an underground excavation or tunnel.
WHSMP-C 01/2018.8                                                   Initials                                               Page 34 of 39

                                                    ____                           ____
Log in to download the original file

Project Management Plan.pdf · 350 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.