Skip to the record
Search everything, all in one place.

Original source · versioned page text

Project Management Plan

Attached to the e-mail Operational Works Application OPW21/0212 - 31 Bottlebrush Ave, - DA Form 1 - Civil & Landscaping Plans - Construction Management Plan - Qleave - Project Management Plan - Traffic Management Plan - cover letter.

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
SECTION 5
Site emergency plan
Procedures in this emergency plan to be communicated to all workers during site specific induction.
In the event of an emergency, nominated personnel will contact the appropriate agency from the list below:
Service Provider                                                                  Telephone number
Ambulance/police/fire and rescue                                                   000
Local medical centre                                                              53431400
Poisons information centre                                                        13 11 26
Energex (damaged power lines - South East Queensland)                             13 62 62
Energex (damaged power lines - outside South East Queensland)                     13 16 70
Powerlink (damaged power lines - transmission towers)                             1800 353 031
Origin (gas leaks)                                                                1800 808 526
Telstra                                                                           13 22 03
Queensland Urban Utilities (water and sewerage - South East Queensland            13 23 64
only)
Local council                                                                     53296500
State Emergency Service (SES)                                                     13 25 00


5.1 Medical emergencies
A nominated representative of the Principal Contractor (e.g. site WHS coordinator) will oversee the following procedure in the event
of a medical emergency:
    1. Clear other personnel from danger area and cordon off area if imminent risk present;
    2. Notify relevant first aid personnel immediately and administer first aid as required;
    3. Call 000;
    4. Ensure clear access for ambulance and/or other emergency services personnel; and
    5. Follow incident notification procedures if required as outlined in section 2.4 of this plan.


The Principal Contractor will provide the following communication system to ensure rapid response in a first air or medical
emergency situation
   Nurse call stations
   Two-way radios issued to first aiders
   Mobile phones issued to first aiders
   Other (provide details below)
Other (details)




WHSMP-C 01/2018.8                                               Initials                                              Page 33 of 39

                                                 ____                           ____
Log in to download the original file

Project Management Plan.pdf · 350 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.