Project Management Plan
Attached to the e-mail Operational Works Application OPW21/0212 - 31 Bottlebrush Ave, - DA Form 1 - Civil & Landscaping Plans - Construction Management Plan - Qleave - Project Management Plan - Traffic Management Plan - cover letter.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn5.3.2 Procedures and instructions for using fire hose reels
Use ONLY on fires involving wood, paper and textiles;
Whenever possible, use two people to operate the hose reel – one person to control the nozzle and the other to ensure the
hose runs freely off the reel;
Turn the valve on by pushing the lever down;
Pull the hose over to the fire;
Twist the end of the nozzle and adjust the spray pattern;
Attack the base of the fire; and
Do NOT use on electrical fires or flammable liquids.
5.4 Structural collapse and/or instability
This section applies to the risk of collapse, rollover or instability of:
Formwork;
Scaffolding;
Tilt-up and precast concrete panels;
Structural steel;
Cranes and major plant; and
Any other major structural components.
Where an incident or risk of the above-mentioned nature is identified, relevant members of the project team and other
persons on site with WHS responsibilities will assess the nature and severity of the risk and:
Coordinate the evacuation of the immediate danger area (this may include the entire site);
Barricade the danger area and prevent unauthorised entry;
Arrange any required medical assistance in accordance with the medical emergencies procedures (Section 6.1);
Contact emergency services to arrange for the safe extraction of trapped and injured persons; and
Promptly arrange any immediate rectification work to make the area safe and follow all required protocols (e.g.
emergency demolition will require notification to WHSQ using Form 66: Notification of emergency demolition – see
Resources).
5.5 Evacuation procedures
The site evacuation coordinators for this project are:
Responsibility Name Contact number
Site evacuation coordinator Steve Cole 0412552971
Standby coordinator
Standby coordinator
The site evacuation coordinator will oversee the evacuation of the site or relevant area of the site;
A standby coordinator will perform the functions of the site evacuation coordinator only when the normal site evacuation
coordinator is unavailable;
Subcontractors’ supervisors and HSR’s will:
Assist in the safe evacuation of their work groups;
Provide assistance in evacuation where required to any person with an impairment or disability;
Keep a head count of workers once they have reached the emergency assembly area; and
Inform the site evacuation coordinator if persons cannot be accounted for.
All persons must:
Evacuate to the emergency assembly area as indicated on the site map when the evacuation alarm is sounded;
Respond immediately to the evacuation alarm;
Evacuate via the fire stairs to the emergency assembly area;
Not:
Put tools away before evacuating;
Run; and/or
Use building lifts or hoists for evacuation purposes in the event of a fire. Hoists and lifts may be used for
other types of emergencies, but only with the permission of the site evacuation coordinator
WHSMP-C 01/2018.8 Initials Page 36 of 39
____ ____