Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                  Remain at the emergency assembly area until given the clearance to leave site or return to work by the site
                  evacuation coordinator
                  Follow all directions given by the site evacuation coordinator or emergency services personnel, if present.



The evacuation alarm will be
   Fixed sirens
   Portable air horns
   Tower crane horn
   Other (provide details below)
Other (details)

The usual sequence of evacuation in the event of a fire will be as follows:
    1. Evacuate the fire-affected floor;
    2. Evacuate the two floors above the fire-affected floor;
    3. Evacuate the floor below the fire-affected floor;
    4. Additional floors may then need to be evacuated if circumstances warrant or if directed by the emergency services.


Evacuation drills will be held
   Monthly
   Quarterly
   Annually
   Other (provide details below)
Other (details)



5.6 Site Map
Site Map
Copies of the site map will be posted
   On the site notice board
   In site offices
   In crib rooms
   In induction/training rooms
   Other (provide details below)
Other (details)

The site map should include the location of the following:
       Entry and exit gates;
       Access roads and paths;
       First aid facilities;
       Carpark area (if applicable);
       Work zones and delivery areas;
       Emergency assembly area;
       Fire fighting equipment;
       Site amenities;
       Crane locations and operational zones; and
       Vehicle access/egress.


Upload site map




WHSMP-C 01/2018.8                                                Initials                                               Page 37 of 39

                                                  ____                          ____
Log in to download the original file

Project Management Plan.pdf · 350 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.