Project Management Plan
Attached to the e-mail Operational Works Application OPW21/0212 - 31 Bottlebrush Ave, - DA Form 1 - Civil & Landscaping Plans - Construction Management Plan - Qleave - Project Management Plan - Traffic Management Plan - cover letter.
SECTION 3
ON-SITE MANAGEMENT OF RISKS AND HAZARDS
The following section is intended to include all aspects of hazards and risks at the work site, for which the Principal Contractor is
primarily responsible for, rather than those that relate to a specific trade, occupation or service, such as:
Electrical work;
Formwork;
Tilt-up and pre-cast concrete work; and
Demolition
Steel erection
Specific risks associated with any of these activities should be addressed in a SWMS supplied by the subcontractor.
3.1 Access and egress
The Principal Contractor will ensure there is safe access to and from the construction site.
Designated pedestrian access ways will be provided to and from the site and also within the site where required;
Designated access ways within site must be kept clear at all times;
Liquid spills in access ways must be cleaned up immediately;
All new workers must first report to the site office for an induction before starting work;
Visitors must also report to the site office and must be either inducted or accompanied by an inducted site staff member
before proceeding on to site; and
Pedestrians are not permitted to use the vehicle and mobile plant site access and egress points.
Subcontractors must ensure materials, plant or equipment does not impede safe access or egress to the site.
Multi-level buildings
Access to different levels of the building will be via
Lifts (when commissioned)
Personnel and materials hoist/s (recommended for six storeys and over)
Perimeter scaffolding
Stairs (fire)
Stairs (permanent)
Other (provide details below)
Other (detail)
3.2 Amenities
The Principal Contractor holds primary responsibility for the provision of amenities. Except where otherwise previously agreed with
individual subcontractors, the following amenities will be provided by the Principal Contractor.
3.2.1 Toilets and washing facilities
Chemical toilets will be provided during bulk earthworks stage, until the plumbing is connected;
Separate male and female toilets will be provided (if required);
All toilets will be cleaned and maintained on a regular basis;
Wash basins, soap and paper towels are provided in, or adjacent to, each toilet facility; and
One toilet will be provided for every 15 workers (or part thereof) on the work site and will be located as listed below.
For multi-level buildings, toilet locations will be in the following locations
Ground floor, 4th floor, and every 3rd floor above the 4th floor
Other (provide details below)
Other (details)
Toilet locations for other buildings, such as demolition sites, industrial sheds, shopping centres, refurbishments, etc.: (please list)
WHSMP-C 01/2018.8 Initials Page 9 of 39
____ ____
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Project Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.