Project Management Plan
Attached to the e-mail Operational Works Application OPW21/0212 - 31 Bottlebrush Ave, - DA Form 1 - Civil & Landscaping Plans - Construction Management Plan - Qleave - Project Management Plan - Traffic Management Plan - cover letter.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn3.2.2 Drinking water
Where no town water supply available, the following arrangements will be in place for the supply of cool, clean drinking water
Portable drinking containers and disposable cups provided by Subcontractors
On-site water tank and disposable cups supplied by Principal Contractor
Other
Where town water supply available, the Principal Contractor will supply water fountains in the following locations
Multi-level buildings – ground floor and then every 2nd level
Other buildings – within a 30 metre radius of all work areas
Other
3.2.3 Lunch rooms
Separate lunch rooms will be available to accommodate the number of workers on the job site;
Workers will not be permitted to consume food outside of the lunch rooms, where provided; and
Lunch rooms will be cleaned and maintained on a regular basis.
Basic lunchroom facilities will include
Tables and chairs
Refrigerator
Wash basin
Electric jug or urn
Microwave oven
Washing facilities (with hot water)
Storage cupboards
Basic crockery and cutlery
Food waste bins and receptacles
Other
Other (details)
Lunch rooms will be provided in the following locations
Site sheds in the office/administration area
Temporary lunch rooms in the building under construction
Other
Other (details)
3.2.4 Other amenities
The Principal Contractor will also supply the following amenities
Showers
Change rooms
Lockers
Other (provide details below)
Other (details)
3.3 Housekeeping, storage and site security
3.3.1 Housekeeping and storage
The Principal Contractor will:
Allocate appropriate storage areas to subcontractors for storage of tools, materials, plant and equipment; and
Arrange for the regular removal of all rubbish and waste materials from site.
WHSMP-C 01/2018.8 Initials Page 10 of 39
____ ____
See the original