SPECIAL MEETING AGENDA                                                           26 APRIL 2018


Ordinary Meeting, 20 July 2017, Item 7, Page 8
That Council note the report by the Infrastructure Assessment Coordinator to the Planning &
Environment Committee Meeting dated 11 July 2017 regarding the review of the Transport
network required for the new Local Government Infrastructure Plan (LGIP) under The Noosa
Plan 2006 and approve:
A.    The Plans for Trunk Infrastructure (PFTI) Maps provided in Attachment 2 to the report
      noting that the locality sub-catchments will be combined into two larger transport
      catchments for the Noosa Coastal Area and the Noosa Hinterland Area when preparing the
      SOW model;
B.    The Transport Network Future Projects for including in the LGIP Schedule of Works(SOW)
      provided in Attachment 1 noting that the base costs estimates will be refined following
      completion of the excel SOW Model; and
C.   Note that further amendments will be made to the SOW and incorporated in a subsequent
     LGIP to be prepared for the new Planning Scheme that reflects Council’s further network
     planning.

Ordinary Meeting, 21 September 2017, Item 8, Page 7
That Council note the report by the Infrastructure Assessment Coordinator to the Planning &
Environment Committee Meeting dated 12 September 2017 regarding the remaining
requirements for the Schedule of Works (SOW) Model for the new Local Government
Infrastructure Plan (LGIP) under The Noosa Plan 2006 and approve:
A.    The methodology used to determine existing trunk infrastructure network items from
      Council’s Geographic Information System (GIS) and current replacement costs obtained
      from Council’s Financial Asset Register;
B.    The Generic Land Valuation prepared by CBRE Valuations Pty Limited dated
      February2012 provided in Attachment 1 to the report and indexed to the LGIP June 2014
      base date as the basis for applying a uniform generic land cost in the Schedule of Works
      Model (SOW) for all existing and future land;
C.   A minor amendment to the Schedule of Works (SOW) future items for the Public Parks&
     Land for Community Facilities Network provided in Attachment 2 to the report noting that
     the cost estimates will be refined following completion of the excel SOW Model;
D.   The LGIP Briefing Note provided in Attachment 3 to the report providing the basis for the
     Infrastructure Network Demand Assumptions and Conversions; and
E.   Note that following completion of the SOW model, draft LGIP and Independent Reviewer’s
     first review, a further report on the complete draft LGIP will be presented for Council’s
     consideration and adoption to proceed to the Minister’s first State review.

Ordinary Meeting, 16 November 2017, Item 3, Page 4
That Council note the report by the Infrastructure Assessment Coordinator to the Planning &
Environment Committee Meeting dated 7 November 2017 and:
A.    Resolve to amend the planning scheme for the Shire of Noosa in accordance with the
      proposed LGIP amendment as outlined in the report; and
B.   Request the Chief Executive Officer to:
     i.  Write to the Minister for Infrastructure and Planning requesting a review of the
         proposed draft LGIP and the Minister’s approval to commence public consultation
         on the proposed amendment;
     ii.    Make amendments to the draft LGIP if required by the Minister to gain approval; and
     iii.   Proceed to public consultation of the draft LGIP on receiving the Minister’s
            approval.



                                                                                 Page 10 of 42
Log in to download the original file

2018-04-26 Special Meeting Agenda(PDF, 8MB).pdf · 7.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.