Skip to the record
The gold standard in government transparency.

Original source · versioned page text

2018-04-10 S&O Agenda - Attachment 1 to Item 4 - Local Disaster Recovery Subplan

of 78

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

6. Triggers for recovery activation and
   actions
The table below details the major recovery triggers, actions and communication requirements
applicable to each level of activation. Note that the levels of activation are aligned with the three
levels of recovery – short, medium and long term.



                                                                                Triggers                     Actions                       Communications
  Response




                                                                           LRG inactive when
                                                                                                 Watching brief by members           Nil
                                                                           LDMG is at Alert
  Alert




                                                                           LDMG ‘Lean            LRG ‘Alert’ level.                  Whispir notification of Alert
                                                                           Forward’ level of     The LRC is briefed by the LDC       distributed to LRG
                                                                           activation.           when the initial damage             members.
  Response Lean Forward




                                                                                                 assessment functions are            LDC maintains
                                                                                                 undertaken during response          communication with LRC
                                                                                                 operations. This will assist the    who in turn liaises with core
                                                                                                 LRC in developing their recovery    members of the LRG.
                          Recovery Alert




                                                                                                 plan.                               Ad hoc reporting as
                                                                                                 Core members of the LRG self-       required by the LDC.
                                                                                                 activate and commence to gain
                                                                                                 situational awareness of the
                                                                                                 event.

                                                                           ‘Stand Up’ of LDMG.   LRG ‘Lean Forward’ level.           Whispir notification of Lean
                                                                           LDMG assesses         DDC and SRG informed of             Forward distributed to LRG
                                                                           event impact and      establishment of LDMG               members.
                                                                           decides to activate   response commences.                 LRC and LRG members in
                                                                           the LRG.              LRC monitors response activities    routine contact and
                          Recovery Lean Forward \ transition to Stand Up




                                                                           Immediate Relief      analyses hazard impact or           monitoring email remotely.
                                                                           arrangements are      potential impact.                   LRG has an initial meeting
                                                                           put in place.         Relief and recovery planning        for planning purposes.
                                                                                                 commences through needs             More regular reporting as
                                                                                                 analysis and recovery               required by the LRC and by
                                                                                                 operational planning.               the DDC and SRG.
                                                                                                 LRC and subgroup structures         Community engagement
                                                                                                 finalised along with reporting      and communication
                                                                                                 requirements.                       strategy developed by
                                                                                                 Deployments for immediate relief    LRG.
                                                                                                 may be commenced by recovery
                                                                                                 functional agencies.
  Response Stand Up




                                                                                                 Completion of initial needs
                                                                                                 analysis, finalisation of LRG and
                                                                                                 subgroup membership and issue
                                                                                                 of Recovery Operational Plan
                                                                                                 signal readiness to move the
                                                                                                 LRG to Stand Up and
                                                                                                 commence medium term
                                                                                                 recovery operations.




Noosa Local Disaster Recovery Subplan 2018                                                                                                                  Page 22
Log in to download the original file

2018-04-10 S&O Agenda - Attachment 1 to Item 4 - Local Disaster Recovery Subplan(PDF, 1MB).pdf · 1.5 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.