Original source · versioned page text
2018-04-10 S&O Agenda - Attachment 1 to Item 4 - Local Disaster Recovery Subplan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Outline the recovery framework adopted for this event and detail
membership of the LRG, subgroups and local advisory groups.
Coordination
Outline communications strategy.
Communications
Specify reporting requirements for the LRG, subgroups and local advisory
groups.
The Recovery Operational Plan should be provided to all stakeholders involved in community
recovery including the Noosa Council, DDC, SRC and SRG. Copies may be provided to statutory
bodies established by the State, e.g. the Queensland Reconstruction Authority.
6.4.1 Example format of a Recovery Operational Plan
NOOSA LOCAL DISASTER RECOVERY GROUP
Recovery Operational Plan
1. EVENT NAME:
2. VERSION Number &
DATE / TIME (Plan
Effective):
3. SITUATION: (impact assessments and outcomes of community needs analysis)
General Background:
Human / Social
Infrastructure
Economic
Environment
4. RECOVERY MISSION (AIM. A single statement of purpose for the recovery operation. Should
encompass medium and long term view. Consider inclusion of improvement.)
5a. OBJECTIVES: (SMART: Specific, Measurable, Achievable, Relevant, Time-framed)
Objective:
Human and Objective:
Social
Objective:
Objective:
Objective:
Infrastructure
Objective:
Objective:
Objective:
Economic
Objective:
Noosa Local Disaster Recovery Subplan 2018 Page 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.