Skip to the record
Beware of cheap imitations.

Original source · versioned page text

SIGNED LEASE to John Holland Queensland Pty Ltd dated 1 June 2026 with plan

of 47

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Docusign Envelope ID: ASBADEEF-A04C-49A2-9666-03AB9F 131037

QUEENSLAND TITLES REGISTRY FORM 20 version 2
Land Title Act 1994, Land Act 1994 SCHEDULE P 39 of 46
and Water Act 2000 age 9 oO!

[ “|

Title Reference 50250532

(g) Installation of temporary signage;

(h) Installation of temporary shelter/sheds for Tenant’s Employees to congregate in;
(i) Temporary access to existing sheds to remove some damage roof panels; and
(j) Temporary gate at the back of the sit to allow access to vehicles.

22.2 Completion of Tenant’s Works
The Tenant agrees and acknowledges that the Landlord requires that the Tenant’s Works undertaken in
accordance with this clause 22 comply with all conditions of consent in clause 12(c), unless the Landlord
notifies the Tenant otherwise.

22.3. Approval for Tenant’s Works and Permitted Use

(a) The Tenant agrees and acknowledges that the Tenant is responsible for obtaining all relevant
approvals and permits necessary for carrying out the Tenant’s Work from the relevant Authorities
and provide a copy of such approvals and permits to the Landlord upon request.

(b) The Tenant agrees and acknowledges that the Landlord has restrictions imposed on it by the local
Council Authorities which restrict truck movements on the Land and on this basis, it is the Tenant’s
responsibility to obtain the relevant approvals and permits necessary for the intended occupation
of the Premises and the Permitted Use from the relevant Authorities and provide a copy of such
approvals and permits to the Landlord upon request.

22.4 Tenant’s Works at End Date
Notwithstanding any other provisions of this Lease, the:

(a) Tenant acknowledges and agrees that at the End Date of the Lease, the Tenant is responsible
for:

(i) removal of all temporary structures, fencing, lighting, signage and sheds installed by the
Tenant during the Term;

(ii) removal of any and all construction waste;
(iii) reinstating the Premises to a safe and tidy condition;

(b) Landlord acknowledges and agrees that at the End Date of the Lease, the Tenant is permitted to
leave the Premises as a gravel hardstand provided the Tenant completes any necessary make
good to ensure that gravel is left in a level condition.

23. LANDLORD'S CONSENT

In each case where the Tenant is required to obtain the Landlord’s Consent under this Lease:

(a) that consent may be given or withheld at the absolute discretion of the Landlord unless the
relevant clause specifically provides otherwise;

(b) the Landlord’s Consent may, if given, be conditional or unconditional;

(c) that consent must be obtained prior to the relevant event in writing; and

194497:3474-5111-9945_v1
Log in to download the original file

SIGNED LEASE to John Holland Queensland Pty Ltd dated 1 June 2026 with plan.pdf · 971 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.