Performance Outcomes Acceptable Outcomes Response
'live' or 'active' infrastructure that standard required by the
may present risk to people using regulatory authority.
the site or surrounding areas; or
damage to infrastructure or
other works. AO7.2 Complies
Editor's note— An approval will Infrastructure is disconnected, The development will ensure
be required from Council's capped or sealed including: infrastructure is disconnected,
Building and Plumbing Services capped or sealed.
(a) electricity meters are
for decommissioning plumbing removed and electrical
apparatus including: wires disconnected;
sanitary drains or reticulated (b) telephone lines are
water supply; and disconnected; and
septic tanks, holding tanks or (c) data cables are
on-site treatment systems. disconnected and
removed.
AO7.3 Complies
A temporary crossing is provided The development can provide a
to protect road reserve temporary crossing to protect
infrastructure including kerb and road reserve infrastructure
channel. including kerb and channel if
required.
AO7.4 Complies
Any damage to footpaths, street The development will repaired
plantings, natural vegetation, kerb or reinstated to at least pre-
and channel, bridges or roadways existing conditions caused by
at the removal site, the new site or damage to street plantings,
between the sites is repaired or natural vegetation, kerb and
reinstated to at least pre-existing channel, or roadways at the
conditions. removal site, the new site or
between the sites.
PO8 AO8.1 PO8 Complies
Waste materials are removed Waste materials are removed from The development will remove
from the site to avoid causing the site. waste materials from the site to
unhealthy conditions including: avoid causing unhealthy
AO8.2 conditions.
(a) potential fire hazard;
If a development permit has not
(b) ponding of water; and been issued for the future use of
the site:
(c) breeding of vermin.
(a) hard surfaced areas
including concrete slabs
5
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix E - Noosa Plan 2020 Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.