Original source · versioned page text
Appendix E - Noosa Plan 2020 Assessment.pdf
Performance Outcomes Acceptable Outcomes Response
are removed or covered
with a minimum of 300
millimetres of soil; and
(b) disturbed areas are
revegetated.
PO9 No acceptable outcome provided. PO9 Complies
The potential for movement from The development will ensure
the site, of soils or similar through safe construction
materials is minimised. management that potential for
movement from the site, of soils
or similar materials is minimised.
PO10 No acceptable outcome provided. Not Applicable
Vacant sites do not have an The development will not involve
adverse impact upon the a vacant site.
amenity of the surrounding
areas.
PO11 AO11.1 Not Applicable
The demolition or removal of a All building materials containing The existing development does
building does not cause a health asbestos, including asbestos not contain asbestos.
risk. cement sheeting or roofing and
lagging, are removed from the
Editor's note— Council may require a
building prior to demolition or
report identifying any asbestos products
relocation.
and how they may be managed to avoid
health risks. AO11.2 Not Applicable
All building materials containing The existing development does
asbestos products are disposed of not contain asbestos.
in accordance with industry best
practice.
6
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix E - Noosa Plan 2020 Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.