Appendix E - Noosa Plan 2020 Assessment
Performance Outcome Acceptable Outcome Response
PO13 AO13 Not Applicable
Road infrastructure is Road infrastructure is
constructed to minimise constructed in accordance with The development does not
adverse environmental Council’s Planning Scheme involve the creation of a new
impacts, including from run-off Policy PSP6 Engineering road.
and erosion. Design Standards – Roads,
drainage and earthworks
External Works and Infrastructure
PO14 AO14 Complies
Development is provided with Where not already existing, the
external works— following infrastructure The development maintains
components are provided at the existing infrastructure
a) along the full extent of relevant to the site and does
the frontage of the site—
the frontage of the site not propose any new
to an appropriate a) full width sealed road; infrastructure components.
standard having regard
b) concrete kerb and
to the specified
channel where
function of the road;
appropriate;
and
c) forming and grading to
b) provided beyond the
footpaths;
site’s frontage if
required. d) vehicular kerb and
footpath crossings;
e) a constructed bikeway;
f) a constructed footpath;
g) a constructed
carriageway;
h) required alterations to
public utility mains,
services or
installations;
i) construction of any
required alterations to
public utility mains,
services or
installations;
98
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix E - Noosa Plan 2020 Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.