Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

Appendix E - Noosa Plan 2020 Assessment

of 219
Performance Outcome                 Acceptable Outcome                 Response

                                       j)   stormwater drainage
                                            works; and

                                       k) installation of electrical
                                          conduits.

PO15                                No acceptable outcome              PO15 Complies
Any alterations or repairs to       provided
infrastructure as a result of the                                      The development will be
development are made at no                                             responsible for any alterations
cost to Council.                                                       or repairs to infrastructure as a
                                                                       result of the development are
                                                                       made at no cost to Council.

PO16                                No acceptable outcome              PO16 Complies
Road infrastructure is proven       provided
to be suitable for its use prior                                       The site is accessed by Hilton
to Council accepting the                                               Terrace which is a part of the
dedicated asset.                                                       exiting road infrastructure and
                                                                       is suitable for residential
                                                                       development.

Staged development

PO17                                No acceptable outcome              Not Applicable
Staged development is               provided
planned, designed and                                                  The development does not
constructed to ensure that—                                            involve stages.

    a) each stage of the
       development can be
       constructed without
       interruption to services
       and utilities provided to
       the previous stages;

    b) the infrastructure
       provided is capable of
       servicing the entire
       development; and

    c) the materials used are
       consistent throughout
       the development.




                                                                                                         99

Log in to download the original (Appendix E - Noosa Plan 2020 Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.