Original source · versioned page text
Appendix E - Noosa Plan 2020 Assessment
Performance Outcome Acceptable Outcome Response
j) stormwater drainage
works; and
k) installation of electrical
conduits.
PO15 No acceptable outcome PO15 Complies
Any alterations or repairs to provided
infrastructure as a result of the The development will be
development are made at no responsible for any alterations
cost to Council. or repairs to infrastructure as a
result of the development are
made at no cost to Council.
PO16 No acceptable outcome PO16 Complies
Road infrastructure is proven provided
to be suitable for its use prior The site is accessed by Hilton
to Council accepting the Terrace which is a part of the
dedicated asset. exiting road infrastructure and
is suitable for residential
development.
Staged development
PO17 No acceptable outcome Not Applicable
Staged development is provided
planned, designed and The development does not
constructed to ensure that— involve stages.
a) each stage of the
development can be
constructed without
interruption to services
and utilities provided to
the previous stages;
b) the infrastructure
provided is capable of
servicing the entire
development; and
c) the materials used are
consistent throughout
the development.
99
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix E - Noosa Plan 2020 Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.