Original source · versioned page text
Appendix E - Noosa Plan 2020 Assessment
Performance Outcomes Acceptable Outcomes Response
from the property
boundary; and
c) the dam work involves
less than 500m³ of
material.
AO12.3 Not Applicable
For all other zones— The development does not
involve a dam.
No acceptable outcome
provided
Constructed lakes No acceptable outcome Not Applicable
provided.
PO13 The development does not
involve a constructed lake.
New constructed lakes which
are proposed to be dedicated
as public assets are to be
avoided unless it can be
demonstrated that the lake:
a) addresses an
overriding need in the
public interest; and
b) adds significant value,
in terms of:
i. amenity including
aesthetics,
landscaping, and
recreation; and
ii. flood management; or
iii. stormwater harvesting
as part of an integrated
water cycle
management plan; or
iv. aquatic habitat; and
c) Can be located:
111
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix E - Noosa Plan 2020 Assessment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.