01. Hales - DA Form 1, Authority to Act & State Code 7
Attached to the e-mail Operational Works Application OPW20/0117 - 37 Mossman Crt Noosa Heads.
Performance outcomes Acceptable outcomes Response
limit the depth of a navigable waterway or the size of vessels which
can navigate a waterway, it is recommended that a vessel traffic
management plan be provided. It is also recommended a marine
execution plan be submitted to the regional harbour master 30 days
prior to the commencement of works.
AND
AO3.4 Development involving the demolition of Complies with AO3.4.
structures in a navigable waterway, including piling, The existing jetty, boat ramp and landscaped rock
ensures the entire structure is removed. and grass area forward of the boundary are be
removed.
AND
AO3.5 Structures, including all freestanding piles, Complies with AO3.5
must be appropriately lit and clearly visible to A pedestal light unit will be positioned on the
approaching vessels, and reflective tape must be jetty. This will ensure the jetty structure is lit
fitted to all structures to enhance visibility during the appropriately for approaching vessels.
hours of darkness. The new boundary wall is within the freehold
property and does not extend into the canal area.
Note: Where necessary, the regional harbour master may require
the installation of aids to navigation on structures.
State Development Assessment Provisions – version 2.4
State code 7: Maritime safety Page 3 of 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.