Original source · versioned page text
01. Hales - DA Form 1, Authority to Act & State Code 7
Attached to the e-mail Operational Works Application OPW20/0117 - 37 Mossman Crt Noosa Heads.
FastTrack5 qualifying criteria checklist 4
Tidal works – impacts on maritime safety (operational works)
(SDAP version 2.4 dated 16 November 2018)
This form must be used when seeking a FastTrack5 assessment pathway for trigger:
1. schedule 10, part 17, division 3, table 2 (operational work in tidal waters)
When submitting an application containing a FastTrack5 trigger to SARA using MyDAS2, applicants must upload a
completed qualifying criteria checklist for each eligible trigger. The responses on the form must demonstrate that
the triggered aspect of development meets all qualifying criteria applicable to the relevant eligible trigger.
Applicants should also provide or make reference to any supporting information or material that supports their claim
for a FastTrack5 assessment.
When seeking FastTrack5 assessment for eligible triggers, you must:
1. have completed any other forms relevant to your application
2. upload a completed copy of this form when referring your application using MyDAS2
3. provide all supporting information required on the form at the time of lodgement – this information will
assist SARA in undertaking its FastTrack5 assessment.
All terms used in this form have the meaning given in the Act or the regulation.
Qualifying criteria Response Supporting
information
provided
Tidal works
1 Is the proposed tidal works for one or Yes: Proceed to question 2. PLANS
more of the following uses: No: Application cannot qualify for the FastTrack5 assessment pathway and
a. private single vessel pontoon must follow the standard SARA assessment. Please refer to the relevant
b. private single vessel jetty SDAP state codes.
c. private single vessel boat
ramp
d. drainage outlet
e. stormwater outlet
f. a revetment wall relating to tidal
works listed in (a) to (e).
2 Will the proposed tidal works, No: Application is eligible for FastTrack5
PLANS
including any structures and any assessment.
vessel berthed, moored or attached A site/layout plan must be provided
to the structure: demonstrating that tidal works, including any
a. encroach into, pass over or structures and any vessel berthed at a
under a navigation corridor; or structure:
b. be located in a high risk a. do not encroach into, pass over or under a
maritime development zone. navigation corridor; or
b. are not located in a high risk maritime
development zone.
Yes: Application cannot qualify for the FastTrack5 assessment pathway and
must follow the standard SARA assessment. Please refer to the relevant
SDAP state codes.
Glossary of terms
DA mapping system means the mapping system containing the Geographic Information System mapping layers
kept, prepared or sourced by the state that relate to development assessment and matters of interest to the state in
assessing development applications.
Note: The DA mapping system is available on the department’s website.
State Development Assessment Provisions – Version 2.4
Appendix 2: FastTrack5 qualifying criteria
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.