Original source · versioned page text
Appendix B - Geotech and Acid Sulfate report - MCU19-0030
Gympie Terrace Noosaville Pty Ltd 1.0 INTRODUCTION This report presents the results of a geotechnical and acid sulfate soils (ASS) investigation carried out by Core Consultants Pty Ltd (Core) for a proposed unit development at 217 to 219 Gympie Terrace, Noosaville. The work was carried out for Gympie Terrace Noosaville Ltd, in accordance with our proposal Q001837-001- L-Rev0, dated 26 October 2018. 2.0 PROPOSED DEVELOPMENT The proposed development is to comprise a three-storey apartment building with a single level basement carpark (excavation depth of approximately 2 m). A concept sketch of the proposed development is shown in Image 1. Column loads are anticipated to be about 2000 kN to 2500 kN. Image 1: Concept sketch of proposed development (Image from Chris Clout Design, Dwg No. C4.0). 3.0 SITE DESCRIPTION The site is located at 217 to 219 Gympie Terrace, Noosaville; covering a total area of approximately 0.11 hectares. The site was generally flat and clear at the time of our investigation, comprising short grass and a few small to medium sized trees located in the south east corner. Site conditions at the time of our investigation are shown in Photograph 1. J000799-002-R-Rev0 Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.